Our Experiences
2020
- Provision of Hot Tapping 8″ Natural Gas Pipeline for ZUMATEX ENGINEERING SERVICES SDN BHD
- Provision of Hot Tapping at PGB, Santong for PETRONAS GAS BERHAD
- Provision of Hot Tapping at Jln Batu Arang, Batang Berjuntai 8″ Linestop Split Fitting for ACE ENERGY SDN BHD
- To Fab & Supply Lifting Cargo Busket for VENATOR
- Provision of Hot Tapping 18″x 10″ x 10″ Way Hot Tap on 18″ Natural Gas Line With Plug Setting for AXIANERGY (M) SDN BHD
- To Supply and Service Hot Tapping Mock Up for SUNGCHANG ENGINEERING & CONSTRUCTION SDN BHD
- Provision of Hot Tap for 8″x8″x16″ at Jelapang Industrial Area, Ipoh Perak for GALAXY ONSHORE SDN BHD
- Rental of Hydraulic Power Pack for YASMIN ENGINEERING SDN BHD
- Provision of Hot Tapping Services for 4″x4″x16″ at Tanjung langsat for WOG GLOBAL RESOURCES SDN BHD
- Provision of Hot tapping Tanjung Pelepas, Penang for SEABOARD ENGINEERING SDN BHD
- EPCC for Continental LNG Satellite Regasification Facilities for Petronas Dagangan Berhad
- Provision of Hot Tapping for EPCC at Telok Gong Loop Pipeline, Melaka. (TUAH) for AXIANERGY (M) SDN BHD
- Provision of Hot Tapping Nature Gas Pipeline, Pasir Gudang for TBDJAYA SDN BHD
- Provision of Hot Tapping – Supply and Install 12″Double Line Stop on Sales Gas without bypass lines (2 Nos) for TECH INFINITY ENGINEERING SDN BHD
- Provision of Hot Tapping at MERU FL STAGE 1/20, KLANG for ACE ENERGY SDN BHD
- Provision of Integrated Civil, Stell Structure and Building for Petronas Onshore Facilities. (Price Agreement 13 July 2020 Till 13 July 2024) for PETRONAS CARIGALI SDN BHD AND PETRONAS DAGANGAN BERHAD
- Supply PMT for SSGP Project for BWS
- Provision of services for Mechanical Package work for Hot Tapping and Line Stop PCESB API UT-0-s-601 at Petronas Chemical Ethylene Sdn Bhd for PASCA BINA / ETHYLENE
- ‘Hot Tapping for feasibility study for Score Project for RANHILL WORLEY
- Supply of Hot Tap services for 8″x 8″ x 8″ Class 300 (EPCC NDS Lukut N.Sembilan) for WOG GLOBAL RESOURCES SDN BHD
- Umbrella Contract For The Engineering, Procurement, Construction And Commissioning (Epcc) For Lng Satellite Regasification Facilities for PETRONAS DAGANGAN BERHAD
- Provision Of Hot Tapping Material & Services for EPCC of the NGDS to Banting FL Stage 3/19 (Reinforcement) Banting, Selangor for I DRILL PIPELINES CONSTRUCTION SDN BHD
- Provision of Hot Tapping for EPCC of NGDS to Shah Alam FL Stafe 2/20 Shah Alam, Selangor for ACE ENERGY SDN BHD
- Provision of Hot Tapping Services at 32″ LP Steam Line Header for BASF PETRONAS CHEMICALS
- Tetra Structure Refurbishment for VENATOR
- Provision of Hot Tapping for Sampling point at TCOT Plant for UBF MAINTENANCE SDN BHD
2019
- Blasting & Painting Pipe & Fitting for VENATOR
- Provision of Hot Tapping service for M1801 EPCC of NGDS to Lipat Kajang , Jasin for Melaka for WZS MISI SETIA SDN BHD
- Supply Manpower & WPS /PQR for VENATOR
- EPCC Of NGDS To Kapar FL 1/18 for A.I TOTAL ENGINEERING SDN BHD
- New Jacketed Spool for D2172 for ARKEMA THIOCHEMICAL SDN BHD
- Reconstruct Concrete Slab for KERTEH TERMINALS SDN BHD
- DFIP 031 Provision of Installation Permeate Flare Meter – 0294/19 (Hot Tapping Services ) for DELEUM PRIMERA SDN BHD
- The Provision of Maintenance and Part Replacement of welding Machined for Petronas Vista Project at Centex Sarawak, Kucing Campus ( 25 March 2019 till 24 March 2020) for INSTITUT TEKNOLOGI PETROLEUM PETRONAS
- Supply 12″ API 5L.X 65 for STEEL HAWK ENGINEERING SDN BHD
- Price Agreement for the Provision of Civil Infrastructure Maintenance Services for Labuan Crude Oil Terminal. (LCOT) for SEA HIBISCUS PETROLEUM SDN BHD
- New Jumper Line Installation at T-7554 and Unit 18 MG3 to Enable T-7554 Shut Down Maintenance (Provision of Hot Tapping Services) for DOMINANT ENERGY SDN BHD
- Provision Of Maintenance and part Replacement of Welding Machines for ILP Pasir Gudang & ILP Mersing for INSTITUT TEKNOLOGI PETROLEUM PETRONAS
- Provision of Jetty Pipe Rack Repair at Petronas Dagangan Berhad Prai Fuel Terminal for PETRONAS DAGANGAN BERHAD
- Plant Safety and Civil Improvement (Road & Pavement Construction & Maintenance) for PETRONAS CHEMICALS AMMONIA SDN BHD
- To supply and service on Line Welding & Hot Tapping for SUNGCHANG ENGINEERING & CONSTRUCTION SDN BHD
- ETP Clarifier Repair for PETRONAS GAS BERHAD
- Provision Of Hot Tapping – Supply of C&S Materials / Equipment (TOPAZ) for TRANSWATER API SDN BHD
- Provision Of Hot Tapping Line Stop for PARAS SAKSAMA SDN BHD
- To Cut 10″ x SCH-40 Pipe into 4 joint (Instep) for RELIACRAFT ENGINEERING SDN BHD
- Provision of Hot Tapping for EPCC of GPRW at Cargo & Logistic Plot PTD 195468, Senai Airport City, Johor for WOG GLOBAL RESOURCES SDN BHD
- Provision of WPS / PQR rental for MUSHTARI MAINTENANCE SERVICES SDN BHD
- To supply Manpower, Tools, and Consumables for Hot Tapping Services at Sipitang, Sabah for MHI ENERGY & ENVIRONMENT (MALAYSIA) SDN BHD
- Provision of Hot Tapping for PSR2 MG3 Turn Around 2019 for MALAYSIAN REFINING COMPANY SDN BHD
- Provision of Hot Tapping for NGDS to Tg.Langsat FL Stage 1/19, Johor for WOG GLOBAL RESOURCES SDN BHD
- LCT – Hot Tapping Steam Condensate Line at Lotte Chemical, Pasir Gudang for SANKYU (M) SDN BHD
- Provision of Hot Tapping for 4″x4″x8″ at Teluk Panglima Garang, Selangor for GALAXY ONSHORE SDN BHD
- EPCC OF NGDS TO MERU FL STAGE 1/19, KLANG, SELANGOR (6″ X6″X6CL600) for I DRILL PIPELINES CONSTRUCTIONS SDN BHD
- Provision of Hot Tapping Services at LCTM, Pasir Gudang for GRACE FIELD CORPORATION SDN BHD
- Provision of Hot Tapping at PGB-UK Plant – ASU 2 Tie In Package for ENPROSERVE (M) SDN BHD
- JRIMR4 To replace tetra pipe for VENATOR
- TK358# Walking Platform Refurbishment for VENATOR
- 2″ Hot Tapping & Line Stop for BASF PETRONAS CHEMICALS SDN BHD
- Provision of Insert Plate Repair for VENATOR
- EPCC for Petronas AERO Kerteh at GPP4 (Civil Works) for AIR PRODUCT
- Provision of Hot Tapping at Nibong Tebal Paper Mil Sdn Bhd for GALAXY ONSHORE SDN BHD
- Provision of Hot Tapping for EPCC to Shah Alam FL Stage 1/19 Selangor for ACE ENERGY SDN BHD
- 1 unit FEM Feed Hopper (TK/31/287/006/01/Hopper) Internal Blasting & Lining Work for VENATOR
- To supply lining materials from FEM Hopper No 2 (Tankguard Storage) for VENATOR
- TK555 Scrubber Water Pipeline for VENATOR
- Supply of WPS/PQR/WQT and Side Outlet Fitting Welding for TRANSWATER API SDN BHD
- Provision of Hot Tapping -Supply & Install 12″ Line Sales Gas Valve Repair without bypass lines for TECH INFINITY ENGINEERING SDN BHD
- Provision of Supply & Hot Tapping services for 4′ x 4′ x 16′ class 300 at Kota Kemuning, Shah Alam for WOG GLOBAL RESOURCES SDN BHD
- Supply of Jotun Thinner – 10L for VENATOR
2018
- LCTM NC2 2E799 & 2E753 Hot Tapping Works for Sankyu (Malaysia) Sdn Bhd
- To perform surface preparation, blasting for VENATOR
- Preparation of Hot Tap ITB for Technip FMC
- To perform Hot Tapping, Line Stopping activities, and A Gate Valve replacement at Sulfur Removal Vessel, V5-0501B At Gas Processing Santong (GPS), Petronas Gas Berhad for UBF Maintenance Sdn Bhd
- New Lift Equipment (Sliding Door Concrete repair – 3 Unit) for Fuji DNDT Sdn Bhd
- Provision of Hot Tapping and Cold Cutting Services for tie in work at KBC Project for EPIC Mushtari Engineering Sdn Bhd
- Flexible Strainer Using Wire Mesh for Steel Hawk Engineering Sdn Bhd
- Turnaround main mechanical works 2018 for Petronas Chemical Ethylene Sdn Bhd. (Provision of 6″ Hot Tapping Works on CGC Discharged Piping) for Newwin Engineering (M) Sdn Bhd
- To Design, Supply and Delivery Tapping Fitting Varies sizes for Progas Enterprise (Brunei)
- Reverse Engineering for DOSH Equipment, Drawings and Catalogue (G-803A,G-809A and G-809B) for Mecip Global Engineers Sdn Bhd
- To perform Hot Tapping for PWC at E3-1901 CW Line for Petronas Chemical Ammonia Sdn Bhd
- To Perform NG Line Replacement for VENATOR
- TA 18 Supply Manpower, Tools, Equipment, and Consumables to perform 216 scrap loader rail replacement and roller servicing for VENATOR
- Touch up & Plug In Hole Inside Lift for VENATOR
- TA 18 Settler Tank #3 Top Cover Repair for VENATOR
- Supply & Hot Tap Services for 12″ X8″ X 8″ ANSI CLASS600 for Galaxy Onshore Sdn Bhd
- Layau River Crossing Replacement Pipeline for CPM Construction Sdn Bhd
- Civil Maintenance Serv – Erosion Control for PETRONAS GAS BERHAD
- TA2018: Special Maint-Splicing for Petronas Chemical Ethylene Sdn Bhd
- To Perform flange resurface for Venator
- To replace nozzle C3 & C4 for Venator
- To provide services Hot Tapping – EPCC of Telok Gong Loop Pipeline, Melaka (TUAH) for AXIANERGY (M) SDB BHD
- To Supply Material and Manpower for the Job PPTSB -P22709 for SANGGUL EMAS SDN BHD
- Pipe Repair Material for PBJV Group Sdn Bhd
- Tie-In work via Hot Tapping method for EPCC of MBC Pilot Plant project at TGAST for DiPETRO SYNERGY ENG SDN BHD
- Rental of TMM Yard and Facilities for PROCESS -V-U
- Preparation of Hot Tap ITB for Technip FMC
- Provision of Hot Tapping at BASF for Prudent International Sdn Bhd
- Scrubber Piping Replacement for Venator
- Hot Tapping of Raw Water Line for BASF PETRONAS CHEMICALS SDN BHD
- Provision of Hot Tapping for NGDS to Tanjung Langsat FL Stage 3/18 Tanjung Langsat Industrial Area, Pasir Gudang , Johor for Galaxy Onshore Sdn Bhd
- Provision of Hot Tapping for NGDS to Pandamaran FL Stage 1/18 NKS Industrial Area, Klang Selangor for Galaxy Onshore Sdn Bhd
- Provision of Hot Tapping for steam condensate line for ARKEMA THIOCHEMICAL SDN BHD
- 12″ Hot Tap & Plug Setting onto Customer 12″ NG Pipeline under Operating Pressure of 18 barg at 25 deg c Operating Temp c/w Hot Tap Technician & Supervisor & Mob Demob of Equipment for WZS Misi Setia Sdn Bhd
2017
- 12″ Gurun Lateral Launcher Dismantle / Assemble for EUREKA EFEKTIF SDN BHD
- Provision of Line Stop and Valve Replacement at Inlet and Outlet Line for Tank T-6621 and T-6620 for PETRONAS PENAPISAN (MELAKA) SDN BHD
- Provision of Hot Tapping Services at Tapis-R-Platform for SAPURA KENCANA HL SDN BHD
- DOSH License Rental for SINO PETROCHEMICAL CONSTRUCTION SDN BHD
- To Perform Hot Tapping Service for BASF PETRONAS CHEMICAL SDN BHD
- 28″ ANSI 900 Spool Modification – Hot Tapping Services for SAMSUNG ENGINEERING CO.LTD
- Rehab – External onshore pipeline inspection & repair for PETRONAS GAS BERHAD
- To repair structure CD#3 Damage for HUNSTMAN P & A ASIA SDN BHD
- To supply Manpower, Equipment, Tools, Consumables for Fabrication and test flexible Host at Gas Processing Santong (GPS). – Fabrication of Aux Parts for PETRONAS GAS BERHAD
- Blasting & Painting for HUNSTMAN P & A ASIA SDN BHD
- Related materials, fabrication works & Installation for PETRONAS TECHNICAL TRAINING SDN BHD
- PGPP-Supply & Delivery Of Support Equipment for PETRONAS GAS BERHAD
- PGPP-Supply & Delivery Of 45kva GENSET for PETRONAS GAS BERHAD
- To supply & material for the Job-PPTSB-P22709 for SANGGUL EMAS SDN BHD
- EPCC of Installation of New Line from KR-1 GPP Supply to KR-2A (PI) GF Header. – Hot Tapping Services for UBF MAINTENANCE SDN BHD
- TK356 Settler Structure Replacement and Refurbishment – To Fabrication, Supply and Install New Steel Structure for Settler for VENATOR
- 3rd Party services for Hot Tapping at TCOT – PIE2 Project (Integrity) for DAYANG ENTERPRISE SDN BHD
- 3rd Party services for Hot Tapping at TCOT – PIE2 Project (Integrity) – VO for DAYANG ENTERPRISE SDN BHD
- To Perform Air Compressor Services for SB BIZ ENTERPRISE
- Installation Heavy AROMATIC New Transfer Line for PETRONAS CHEMICALS AROMATIC SDN BHD
- Term Contract for Rehabilitation and Repair work for Peninsular Gas Utilization (PGU) Pipeline Facilities (Package B-Southern) Contract Period 04th September 2017 Till 3rd September 2019 for PETRONAS GAS BERHAD
- Lift Structure Removal and Replacement at Hunstman P & A Asia Plant at Teluk Kalong for VENATOR
- To Provide necessary manpower, consumables, parts, material, and tools to carry out activities Ethylene grid pipeline. (Optimal) for PETRONAS CHEMICALS DERIVATIVES SDN BHD
- General Onshore Pipeline Construction Flowline Project for PETRONAS TECHNICAL TRAINING SDN BHD
- Emergency Rectification Works on NPS 12 Jet A1 Fuel Penang Port for PETRONAS DAGANGAN BERHAD
- Refrigeration Pipe Spool Modification Work for NEWTEMS CO., LTD (SAMSUNG)
- Road & Pavement Construction & Maintenance for PETRONAS PENAPISAN (TERENGGANU) SDN BHD
- Blasting & Painting Works for TK411 New Lift Equipment – REV.01 for FUJI DNDT SDN BHD
2016
- To Supply Manpower, Equipment, Tools, and Transportation for SANGGUL EMAS SDN BHD
- PL086B Sectional Replacement for NURI CERAH
- To provide mechanical work at HV-2911, BV 107, BV 107, BV 108, and BV 109 for Rectification Work, SSGP. (Package B.14) for SHIN YANG SDN BHD
- Replacement of malfunction CV at GPP4-SL for PETRONAS GAS BERHAD
- Fabricate and Replace 1″ Piping gas at PIP for HUNSTMAN P & A ASIA SDN BHD
- To Dismantle and reinstallation of gas tubing connection between 2″ plug valve and actuator system as requested by PCSB. (Package E) for ZECON BERHAD
- To Relocation Cumbustation blower and fabric for HUNSTMAN P & A ASIA SDN BHD
- Hot Tapping – Phase 2″ (3″ Onto 6″) for SAMSUNG ENGINEERING SDN BHD
- To replace new piping at air receiver for HUNSTMAN P & A ASIA SDN BHD
- LFO Thermoweld work via online welding for ALSTOM SERVICES SDN BHD
- To provide mechanical work at BV 112, BV 113, BV 114, BV 115, and BV 116 for BV rectification work, SSGP (Package D.14) for SHIN YANG SDN BHD / PEKERJAAN PIASAU KONKERIT SDN BHD
- PGPP Hottapping at Penggerang, 30″x30″x30″ CL 600 via 3-way tee GAS PIPELINE for PBJV GROUP SDN BHD
- NETTS Hottaps/Stopples works, 8″ & 12″ CL600 Propane & Butane Lines for PBJV GROUP SDN BHD
- To supply Manpower, Tools, and Consumables for repairing crystallizer (PMT68738) leakage for HUNSTMAN P & A ASIA SDN BHD
- Blasting for TK385 Crystallizer – Internal Blasting for HUNSTMAN P & A ASIA SDN BHD
- Fabrication Of Aux Parts for PETRONAS GAS BERHAD
- Crystallizer Ducting Refurbishment Work for HUNSTMAN P & A ASIA SDN BHD
- To provide mechanical work at BV110 and BV111 for BV rectification work, SSGP for TRC (SARAWAK) SDN BHD
- Crystallizer Nozzle Repair for HUNSTMAN P & A ASIA SDN BHD
- To Modify Natural Gas Piping and Relocate Filter at Boiler NO 1 & Boiler No 2. for HUNSTMAN P & A ASIA SDN BHD
- Boiler tube sidewall casing repair for HUNSTMAN P & A ASIA SDN BHD
- TK385- Crystallizer HT and Box Up for HUNSTMAN P & A ASIA SDN BHD
- Hot Tapping at PPMSB for MUHIBBAH ENGINEERING SDN BHD
- Proposal for 12-inch slip-on flange modification for HUNSTMAN P & A ASIA SDN BHD
- TK385- Crystallizer Ducting Leak Test for HUNSTMAN P & A ASIA SDN BHD
- Internal Painting Works for HUNSTMAN P & A ASIA SDN BHD
- 28″ Bellow Installationfor HUNSTMAN P & A ASIA SDN BHD
- Provision of Hot Tapping for ARKEMA THIOCHEMICALS SDN BHD
- Provision of Online Welding and Cold Tapping Activities for Dulang-B (Provision of Facilities Improvement project (FIP) – Package C for MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD
- To remove 2 unit Ball Unit Valve 2″ x 150#. For PPTSB for SANGGUL EMAS SDN BHD
- TAR Village – To Supervision, Manpower, Materials, Equipment, Tools, Consumables and Transportation to construct TAR Village for BP PETRONAS ACETYLS SDN BHD
- Provision of Hot Tapping for EPCIC for RGT1 Minimum Send Out Capability Improvement Project for MEB CONSTRUCTION SDN BHD
- To Supply Manpower, Equipment, Tools, Instrument, Consumable and Transportation for Actuated Ball Demin Sequence Valve Replacement for PPTSB for SANGGUL EMAS SDN BHD
- To Supply manpower, tools & consumables to perform pipe surface preparation, STOPAQ for TRC (SARAWAK) SDN BHD
- Provision Of Hot Tapping (Size 6″) at Locations on CTW for IDEMITSU SM (MALAYSIA) SDN BHD
2015
- Provision of Hot Tapping works for Tebong City Gate Project PGB for TRANSWATER API SDN BHD
- EPCC CI Injection Piping at NPS48 line for PETRONAS GAS BERHAD
- Provision for installation New Gas Line at Huntsman Tioxide Plant at Teluk Kalung for HUNTSMAN TIOXIDE (MALAYSIA) SDN BHD
- Additional NG Pipeline re-route for HUNTSMAN TIOXIDE (MALAYSIA) SDN BHD
- Provision of all necessary materials, equipment, and labor for construction, installation, and testing of the specified works below (Hot Tapping) for PETRONAS CHEMICALS OLEFINS SDN BHD
- Cosmetic Painting for GPP Tie-In Piping for SAMSUNG ENGINEERING (M) SDN BHD
- Provision of Insurance – Comprehensive General Liability & Workmen’s Compensation for HUNSTMAN TIOXIDE (MALAYSIA) SDN BHD
- 4″ Medium Steam Hot Tapping for ARKEMA THIOCHEMICALS SDN BHD
- Provision of Hot Tapping for Petronas Gas Berhad – Installation of Chemical Injection for ENPROSERVE (M) SDN BHD
- Provision of Hot Tapping Services at OSC for DAYANG ENGINEERING SDN BHD
- Provision of new WPS/PQR/WQT with TMM to provide for TRANSWATER API SDN BHD
- Provision of Hot Tapping Welding of 1Nos 10″ Hot Tap Point on 24″ Header Line for RANHILL E&C SDN BHD
- To perform Major Structural / Piping Replacement at GPK for PETRONAS GAS BERHAD
- Provision of Preparation of Hot Tapping & AS for PETRONAS CARIGALI SDN BHD
- Hot Tapping Tie-In work for “Provision of EPCC of Flare for INTEGRITY ENGINEERING SERVICES SDN BHD
- PPTSB upgrading project – HMD Project Schedule for CRESCENT ENGINEERING (M) SDN BHD
- Site Installation for SANGGUL EMAS SDN BHD
- Provision of Hot Tap and Line stop at Inlet and Outlet Line for Tank T-6619 at PP(M)SB for PETRONAS PENAPISAN (M) SDN BHD
- Provision Of Onshore Maintenance and Civil Works for Petronas Carigali Sdn Bhd. (Price Agreement) for PETRONAS CARIGALI SDN BHD
- Provision of Manpower, Materials, Tools, and Equipment for dump Conveyor structure refurbishment at Hunstman Tioxide Plant at Teluk Kalong for HUNSTMAN TIOXIDE (MALAYSIA) SDN BHD
- Nitrogen Pallet (16 Cylinder / Pallet) for HUNTSMAN TIOXIDE (MALAYSIA) SDN BHD
- Provision of PIG Trap Maintenance for Riser Repair for PL 125-SOB for PBJV GROUP SDN BHD
- Hot Tapping (3″ 2 Points) at BASF BDO Complex for DIALOG PLANT SERVICES SDN BHD
- To supply Manpower Equipment, Consumables and Material for Replace 10″ Flange Nozzle and Built-Up Welding Flange 20″ Manhole Crystallizer and 30″ Flange Crystall Condenser PMT No 68738 & PMT 68739 for HUNSTMAN TIOXIDE (MALAYSIA) SDN BHD
- SSGP SECTION 1 Pre-Commissioning for PETRONAS GAS BERHAD
- Additional Pipeline Commissioning for PETRONAS GAS BERHAD
- EPCC OF MP DESUPERHEATER PROJECT for PETRONAS PENAPISAN (T) SDN BHD
- EPCC OF MP DESUPERHEATER PROJECT for PETRONAS CHEMICALS AROMATICS SDN BHD
- Provision of repair and maintenance of Sabah & Sarawak Gas Pipeline (SSGP) – Terms Contract (01 Dec 2015 Till 30 Nov 2017) for PETRONAS GAS BERHAD
- Replace 2 pcs 1 beam at Conveyor for HUNTSMAN P & A ASIA SDN BHD
2014
- To fabricate and install acoustic hood for PETLIN MALAYSIA SDN BHD
- The Provision of Hot Tapping Works for Prai II Lateral Gas for PBJV GROUP SDN BHD
- Rental Workshop for MATRIX COOLING (M) SDN BHD
- Install of 4 Isolation valves at SW Line – Hot Tapping for PETRONAS CHEMICAL ETHYLENE (M) SDN BHD
- Price Agreement for Rehabilitation and Repair Works For PGB-TOD Pipeline system (Feb 2014 to January 2017) for PETRONAS GAS BERHAD
- PBJV/SC/CO-1831/TMM/05/2014 for PETRONAS GAS BERHAD
- PAC injection line spool replacement L/S – Metallic Structure Piping for PETRONAS GAS BERHAD
- Mechanical Construction works – Incinerator Auxilary Piping Removal for PETRONAS CHEMICALS ETHYLENE (M) SDN BHD
- To fabricate and install IP steam @ASU1 for PETRONAS GAS BERHAD
- Mechanical Construction works – GMP1.1 Instal. Isolate Valve E118A &E119A for PETRONAS CHEMICALS ETHYLENE SDN BHD
- Metallic Structural / Piping – To Replace Structure XV4126 & Turb.Filter Housin for PETRONAS GAS BERHAD
- Special Maintenance – Hot Tapping for MALAYSIA REFINING CO SDN BHD
- Cadangan Membina dan Menyiapkan “Tank Farm” di atas lot PLO 78, Palm Oil Industrial Clustrer (POIC) di kompleks perindustrian Tg.Langsat, Mukim Sg. Tiram , Daerah Johor Baharu, Johor. (RM 13,911,766.00) for JOHOR CORPORATION
- Supply of Thermo Shield Rust Convertors to PCB. (USD 5,631.00) for PETRONAS CARIGALI (TURKMENISTAN) SDN BHD
- Hot Tapping Works at GPP- A Plant for MISI SETIA OIL & GAS SDN BHD
- RPD – Proj – Liq & Gas Smplg & Drain Upgrading for PETRONAS PENAPISAN (TERENGGANU) SDN BHD
- Installation Of Battery Limit BV for PETRONAS GAS BERHAD
- GPP 6 TA 2014 ST small Bore Rectification / Metallic Structure / Piping for PETRONAS GAS BERHAD
- Provision of Hot Tapping Services for Petronas Carigali Sdn Bhd (Contract) 04 May 2014 to 03 May 2018 for PETRONAS CARIGALI SDN BHD
- Provision of Hot Tapping Services for Terengganu Gas Terminal Project & GPP Tie – in for SAMSUNG ENGINEERING (M) CO.LTD
- Piping rectification works GPP 1 for PETRONAS GAS BERHAD
- To perform piping works rectification GPP 1 for PETRONAS GAS BERHAD
- Repair Works for Damaged Roof at PGB-CUF Kerteh for PETRONAS GAS BERHAD
- To perform piping rectification PRR -GPP4 for PETRONAS GAS BERHAD
- External – Onshore Pipeline Inspec & Repair (Lawas Sarawak) for PETRONAS GAS BERHAD
- Pressure & Unpressurized Vessel for PETRONAS CHEMICALS MTBE SDN BHD
- SS Piping replacement at NaOH line for PETRONAS GAS BERHAD – CUFK
- Repair lining, internal parts & loading for PETRONAS GAS BERHAD
- EPCC for Onshore slugcather (OSC) blending facilities of TGAST -OSC – GPPA (TOG) modification project for Petronas Carigali Sdn Bhd. for KEJURUTERAAN QKS SDN BHD
- Purchased Of high-Temperature cable for MCR-A (USD 8,500.00) for PETRONAS CARIGALI (TURKMENISTAN) SDN BHD
- Paint, Light gry, 5kg/cm, chemco, RA 500 (USD 16,678.62) for PETRONAS CARIGALI (TURKMENISTAN) SDN BHD
- Hot Tapping for Ammonia Cooling Down Line at KTSB for DIALOG E&C SDN BHD
- Provision of OnLine Welding for Clamp (Hot Tapping at Bintulu) for AMALGAMATED PLANT ENGINEERING SDN BHD
- 5975 Fire Resistance Coat Class A ” Thermo – Shield” (USD 17,988.25) for
- Special Maintenance- Hot Tapping (Optimal) for PETRONAS CHEMICALS OLEFINS SDN BHD
- Supply of JIT Team for ARKEMA THIOCHEMICALS SDN BHD
- TK-518 Tank Cleaning for Kemaman Bitumen Company Sdn Bhd
- Change of Piping from CS to PTFE lined – Metallic Structural / Piping for PETRONAS CHEMICALS FERTILIZER KEDAH SDN BHD
- Supply Manpower For Calibration Works At Bekok-A Platform for FMK ENERGY SDN BHD
- Procurement, fabrication, modification work for ARKEMA THIOCHEMICALS SDN BHD
- Standard 1″ Hot Tap onto Tank for DIALOG E&C SDN BHD
- External – Onshore Pipeline Inspec & Repair (Reinstatement of CI injection Point) for PETRONAS GAS BERHAD
2013
- Metallic Structure Piping – GPP2 Smallbore Rectification for PETRONAS GAS BERHAD
- PMO Provision of Installation for Chemical Injection Skid at Pulai – A & Bekok -A Via Hot Tapping for PCSB-PMO
- Provision of Topside Structural Maintenance ( TSM ) service for PCSB-PMO-PTSM 333 TCOT 10″ ANSI 150 Stopple Train Plugging Crude Line Repair – Hot Tapping for PFCE ENGINEERING SDN BHD (TCOT)
- Provision of Insulation works for winter readiness at GTPOGT, Kiyanly for PETRONAS CARIGALI TURKMENISTAN
- To supply labor, material, tools, and equipment c/w fittings. Scaffoldings, mob/demobilization & on line welding / NDT to provide Hot Tapping Services for 42″ x 3″ ANSI class 600 Pipes for Petronas Gas Cogen Plant, Kerteh & Paka, Terengganu for SHINRYO (MALAYSIA) SDN BHD
- Supply, Fabrication, Delivery At Site, Site Erection, Testing and Guarantee Of Fire Protection System For 1000TPD New Refining Plant, Upgrading Existing Fire Hydrant System And Other Ancillary Works At Kuantan Oil Products, Kuantan, Pahang for Felda Vegetable Oil Products Sdn Bhd
- Provision of 3″ Hot Tapping services for Petronas Chemical Fertilizer ( Kedah ) Sdn Bhd
OGPC -PCSB Hot Tap ( 8″ onto 36″ Header ) for PETRONAS CHEMICAL FERTILIZER (KEDAH) SDN BHD - 1 1/2″ Single Line Stopping at PCEMSB Plant for CGE SYSTEMS SDN BHD
- To repair/refurbish roof gutter at vehicle’s bay, at station A CEFS Response for CEFS RESPONSE
- S2-931 Flare Smallbore Rectification for PETRONAS GAS BERHAD
- The Provision of Manpower, Equipment , Tools, and Materials for Hot Tapping Piping Services at GPP-B for PETRONAS GAS BERHAD
- To repaint external wall and handrail at Station A, CEFS Response for CEFS RESPONSE
- Pipeline Integrity Inspection at ASBFT for PETRONAS DAGANGAN BERHAD
- The Engineering, Procurement , Construction, and Commissioning (EPCC) of new test Rig facility and associated work at Kerteh Aviation Terminal for PETRONAS DAGANGAN BERHAD
- Provision of Procurement, Installation, and Testing of Corrosion Monitoring System at Samarang Platform for Petronas Carigali Sdn Bhd
- 4″ Hot Tapping Nitrogen Line PGB-CUF for PETRONAS GAS BERHAD (CUF KERTEH)
- To remove contaminated gravel (Civil maintenance serv – site preparation) for PETRONAS GAS BERHAD (TOD)
- To Construc new OPN Lab (Building & Structure Construction) for PETRONAS CHEMICALS AMMONIA SDN BHD
- Metallic Structure Piping – GPP 2 & 3 – Hot Tapping for PETRONAS GAS BERHAD -CUF
- Provision of Hot Tapping Services for PETRONEEDS SERVICES INTERNATIONAL “PSI”
- LPG Inspection for NSTP AJIL TERENGGANU
- Vessel PMT Registration at Kerteh RO (Pressure & Unpressurized Vessel) for PETRONAS GAS BERHAD
- EPCC Export Crude Oil Quality Improvement Project at Heglig CPF – Provision Of Hot Tapping Services for RAM ENERGY CO. LTD / PSI.
- To perform Hot Tapping for HRU Project for PETRONAS CHEMICALS AMMONIA SDN BHD
- Pipeline Repair Rehab and Repair at NPS 10″ Feed Condensate Kerteh for PETRONAS GAS BERHAD
- Plant Rejuvenation and Revamp 2 (PRR2) Project for HYUNDAI ENGINEERING CO, LTD
- 6″ ANSI 150 Single Line stop Plugging for Service Water Line Repair at Petronas Chemical Optimal Sdn Bhd for MUSHTARI MAINTENANCE SERVICES SDN BHD
- To provide & Perform Cold Tapping Service Work for the Carbon Steel Pipe at Duyung Platform for MISI SETIA OIL & GAS SDN BHD
- Repair Based on Corrosion Survey ACW (Building and Structure Construction) for PETRONAS GAS BERHAD
- Metallic Structural / Piping for PETRONAS GAS BERHAD
- SMA Kongsberg Fieldwide Replacement Project for KENCANA HL SDN BHD
- IBA KG2 Fieldwide Replacement Project for KENCANA HL SDN BHD
- PR: PLOC repair activity GPP5 SD for PETRONAS GAS BERHAD.
- To Supply & Install Acid Pump Spool for PETRONAS GAS BERHAD.
- GPP5 STEAM TURBINE SMALLBORE RECT for PETRONAS GAS BERHAD.
- Provision of Hot Tapping works inclusive of supply, deliver, and perforation of Hot Tap Fittings and Accessories for MISI SETIA OIL & GAS SDN BHD
- Supply and fabricate perforated deck drain strainer for SAPURA KENCANA HL SDN BHD
- Repair Acoustic Enclosure for MAC, GAN for PETRONAS GAS BERHAD
- Provision of Pipeline isolation using a temporary plug for PCSB-SKO – Hot Tapping 12″ for OMBAK MARINE GROUP SDN BHD.
- Sewa Laluan Tanah di Bukit Labohan for ALGOTECH (M) SDN BHD
- Repair and Rehabilitation at NPS 12 Propane PGU-I LOOP ( Kerteh RO ) for PETRONAS GAS BERHAD
- To construct sampling station SC-1701 for PETRONAS CHEMICAL AMMONIA SDN BHD
- Provision for Inspection Worklist executes for PETRONAS PENAPISAN (TERENGGANU) SDN BHD
- To perform rectification work @ TOD-Miri for PETRONAS GAS BERHAD
- Building & Structure Construction – To repair blowdown drum G concrete support for PETRONAS GAS BERHAD – CUF
- Upgrade Surau Al-Hidayah Facilities for PETRONAS CHEMICALS ETHYLENE MALAYSIA SDN BHD
- Pipeline External Corrosion direct assessment (ECDA) and coating repair for Gurun & Shah Alam Regional for PETRONAS GAS BERHAD
- Provision of Procurement, construction and Commissioning of Hot Tap Associated Services to install Tie-In Points for Process Corrosion Monitoring and Chemical Injection Facilities for PETRONAS CARIGALI SDN BHD
- Provision of Preparation Tie-In Points V for PETRONAS CARIGALI SDN BHD
- Hot Tapping and Stoppling at NPS 8 LPG TTM Pipeline for PETRONAS GAS BERHAD
- KIPC guardhouse Renovation and Civil Works for PETRONAS CHEMICALS AMMONIA SDN BHD
- Roof Repair for K3-1402 Compressor house for PETRONAS CHEMICALS AMMONIA SDN BHD
- Installation of sampling point system for PETRONAS CHEMICALS ETHYLENE MALAYSIA SDN BHD
- PCC of Sipitang Lateral Gas Pipeline Project for PETRONAS GAS BERHAD
- Pipeline Repair Rehab @ 10″ Fec Kth for PETRONAS GAS BERHAD
- Metallic Structure Piping – GPP2 Smallbore Rectification for PETRONAS GAS BERHAD
- S2-931 Flare Smallbore Rectification for PETRONAS GAS BERHAD.
2012
Price Agreement to perform Leak Rectification Work at POD, CUF and export Terminal, Petronas Gas Berhad, for the their Period of Three (3) Years with an option to extend another Two (2) Years (3+2) for PETRONAS GAS BERHAD
Manpower for install new stretch hood for POLYETHYLENE MALAYSIA SDN BHD
Provision of fabrication, Installation & Commissioning of permanent chemical injection skid for Semarang Platform for GROWTH AVENUE SDN BHD
Hot Tapping at 20″ BD Line for PFKSB for PETRONAS FERTILIZER KEDAH
TCOT PWSU tail end & remedial work for KENCANA PETROLEUM HL
Provision of fabrication, Installation & Commissioning of permanent chemical injection skid for Semarang Platform. (Safety Habitat) for GROWTH AVENUE SDN BHD
EMOC 27_11 New Isolation Valve for ETHYLENE (M) SDN BHD
GPP4 Firewater line leak rectification for PETRONAS GAS BERHAD
Supply manpower, tools and consumables to perform welding of Hot Tapping fittings and to provide Hot tap specialist, equipment & tools, and qualified operators to perform 1 number of Hot Tap Service for COTRADE SDN BHD
Engineering, Procurement, Commissioning, and Construction of KPP
Gas Pipeline package for KIMANIS POWER PLANT SDN BHD
Supply Manpower for PRR GPP3 for PETRONAS GAS BERHAD
To rectify manhole in front of the store for CEFS RESPONSE
To supply Nitrogen Pallet for 3 GREEN GTL SDN BHD
Provision to supply materials, manpower, fit-up, welding, and installation works for 3 GREEN GTL SDN BHD
Hot Tapping service 14″ x 32″ ASTM A672 Gr 60 line for RAHABCO ENGINEERING & CONSTRUCTION SDN BHD
To perform Hot Tap at V-506 for POLYETHYLENE MALAYSIA SDN BHD
Oxygen Cleaning Class AAA Service for PETRONAS GAS BERHAD – CUF
To supply material, tools, and labour to paint the interior side of CEFS main station for CEFS RESPONSE
To supply manpower for site survey tiles repairs works at BRA Q for DAYANG ENTERPRISE SDN BHD
Provision Of Hot Tapping Services for South Annam Pipeline System
Projects at Sudan for PETRONEEDS SERVICES INTERNATIONAL
To fabricate Ejector for MTBE MALAYSIA SDN BHD
Pembinaan Rumah Kedai di Kuantan, Pahang for TMM CONSTRUCTION
Provision of Manpower, Equipment, Tools, Material, Transportation, Consumables and All Associated works for Hot Tapping Services for PFCE ENGINEERING SDN BHD
Cabinet, Fibreglass for 45kg ANSUL CO2. for TALISMAN MALAYSIA LIMITED
Cadangan membina dan menyiapkan Tanjung Langsat Biomass Steam Plant di PTD 78, Palm Oil Industrial Cluster, Tanjung Langsat, Daerah Johor Bahru, Johor for JOHOR CORPORATION SDN BHD
Provision of Installation and Repair Services for Piping and Equipment at OGT PC(T) SB. for PETRONAS CARIGALI (TURKMENISTAN) SDN BHD
Supply manpower Fitter / Welder for TRISYSTEMS ENGINEERING SDN BHD
To supply manpower, Tools & Consumables for removal of deflector for D-R61 75/50K Overhaul for DRAP at GPP-B, Kerteh for DRESSER -RAND ASIA PACIFIC SDN BHD
Turbine Enclosure Integrity Restoration Project for KENCANA PETROLEUM HL
To rectify heat exchanger for PETRONAS GAS BERHAD
ASU 2: Hot Tap and Line Stop to remove old piping for PETRONAS GAS BERHAD – CUF
Supply of Fire Rated Door Size (3’x7′) at Multi-Purpose Hall for PETLIN (MALAYSIA) SDN BHD
TAF0812050/Replace of existing fencing Kerteh storehouse. for EXXONMOBIL
Provision of online Welding on BFW Line for SHELL MDS (Malaysia) Sendirian Berhad
GPP 3 Underground FW Leak Rectification for PETRONAS GAS BERHAD
Manpower supply for extended PRR GPP3 for PETRONAS GAS BERHAD
To perform Hot Tapping at PCFKSB for PETRONAS CHEMICAL FERTILIZER KEDAH SDN BHD
To service Air Compressor and Pressure Vessel for PETRONAS WILAYAH PANTAI TIMUR
Appointment as Gas Metering Station EPCC Contractor for the 100mw
Combined cycle gas-fired power plant on Lot sNT11066, NT11067, NT11068, NT11069 & 023.59864 at Kimanis, District of Papar, Sabah for SPR ENERGY (M) SDN BHD
Provision of 2″ Inch Hot Tapping at Uniti South Sudan for SIPET ENGINEERING & CONSULTANCY LTD (SPECS)
- Engineering, Procurement, Commissioning, and Construction of KPP Gas Pipeline package for KIMANIS POWER PLANT SDN BHD.
- Smallbore rectification for GPP 4 SD for PETRONAS GAS BERHAD.
2011
- Provision of Personnel, Equipment and material for Living Quarters repair and Maintenance Services (1+1 Contract) for EXXONMOBILE EXPLORATION AND PRODUCTION
- Repair & Rehab NPS 8 PGU C3 & C4 for PETRONAS GAS BERHAD
- Law A compressor restage and TCP upgrade project for KENCANA HL SDN BHD
- Specialist Mechanical (6″ Line Stopping) for ETHYLENE (M) SDN BHD
- Supply and deliver full encirclement split Hot Tap Tee & Welding work on 24″ Split tee – Hot Tapping for PETRA RESOURCES SDN BHD
- Provision for onshore slug catcher (OSC) valve retrofits project of gas pipeline for bicep application at Lawit 18″ kicker line – Hot Tapping Services for CARIMIN ENGINEERING SDN BHD
- Provision for onshore slug catcher (OSC) valve retprofits project of gas pipeline for bisep application at Lawit 18″ kicker line.- Supply Stop Fitting for CARIMIN ENGINEERING SDN BHD
- Inspection and testing of LPG piping system for NEW STRAITS TIMES PRESS(M) BERHAD
- To design, construction, fabricate, deliver and install at the fire training ground, CEFS Response for CEFS RESPONSE Engineering
- Procurement, Construction for PETRONAS GAS BERHAD
- Provision of pipeline process corrosion monitoring facilities installation at Tembungo for PCSB-SBO for PETRONAS CARIGALI SDN BHD
- Repair & Rehab for NPS 36 Loop 1(Ktn RO) for PETRONAS GAS BERHAD
- Repair & Rehab for NPS 36 Loop 1(Ktn CS) for PETRONAS GAS BERHAD
- Repair & Rehab for NPS 36 Loop 1(Ktn RO-Add) for PETRONAS GAS BERHAD
- To design and supply of Liquid Removal Tank, Shell and Tube Exchanger and Product tank for 3 GREEN GTL SDN BHD
- Rep & Rehab NPS 36 PGU Loop 1 (Kerteh) for PETRONAS GAS BERHAD
- The provision of manpower & equipment for rolling plate services for KENCANA HL SDN BHD
- Renovation of CSR & SS Room for KERTIH TERMINALS SDN BHD
- Leak Rectification at GPP A for PETRONAS GAS BERHAD
- Modification of pipe support for steam for PETRONAS GAS BERHAD
- The Supply and Delivery of malleable steel CC 600 Transport chain of total length 1500m for Melaka, Prai, and Kerteh LPG Bottling Plants for PDB for PETRONAS DAGANGAN BERHAD
- Emergency Pipe Rack at GPP – B for PETRONAS GAS BERHAD
- Provision of pipeline process corrosion monitoring facilities installation at Semarang for PCSB-SBO for PETRONAS CARIGALI SDN BHD
- EPCC of NGDS to Westport FL Stage 1/11 Pulau Indah, Selangor – Onsite Hot Tapping boring / install completion plug for 4: onto 8: existing line for SEDIA ENGINEERING WORKS SDN BHD
- Hot Tap Service for 18″ ANGSI kicker line for Bisep Application. (TCOT) for CARIMIN ENGINEERING SDN BHD
- Provision of Hot Tapping works at PP(T)SB for PETRONAS PENAPISAN (T) SDN BHD
- Offshore installation of pipeline corrosion monitoring facilities (CC, CP, BP, FSP) at EWP-A & EWDP-B consisting of Hot Tapping Services for CALIDAD SDN BHD
- Price Agreement to perform Leak Rectification Work at POD, CUF and export Terminal, Petronas Gas Berhad, for the Period of Three (3) Years with an option to extend another Two (2) Years (3+2) for PETRONAS GAS BERHAD
- On-Line Seal Welding fir Tee Clamp-on BFW Line (Hot Tapping) for SHELL MDS (MALAYSIA) SDN BHD
- Supply of Stopple Fitting – Hot Tap for PETRONAS CARIGALI SDN BHD
- 6″ BV Installation for Unit #2 SCS Fuel for PETRONAS GAS BERHAD
- Welding work on 24″ Split Tee- Hot Tapping (Bintulu) for PETRA RESOURCES SDN BHD
- Neutralization Basin Line Stoppling for Optimal Olefins – Hot Tapping for PASCA BINA SDN BHD
- To fabricate structural Skid and Supply Manpower, Material, Equipment, Consumable, NDT, Blast & Paint (3 Coats) for 3GREEN GTL SDN BHD
- To perform Hot Tapping for 1A piping for PETRONAS GAS BERHAD – CUF
- GPP 2 Fire Water Piping System Assessment for PETRONAS GAS BERHAD
- Olefins E-1712 Hot Tapping for Wash Oil Injection Nozzles (OLGO012) for PASCA BINA SDN BHD
- To fabricate 1″ pipe spools and supply manpower, materials, equipment, tools, consumables, NDT, Testing, Painting, and 1/2-300# manual ball valves SS-316 for 3GREEN GTL SDN BHD
- Supply, fabrication, and removal installation of Piping and E&I work at vendor MOPU Gas Lift Compressor Package (Hot Tapping Services) for EPIC MUSHTARI ENGINEERING SDN BHD
- LPG Inspection for MAJLIS AMANAH RAKYAT MARA
- Provision of Hot Tapping Operations for Valves Changeout at Terengganu Crude Oil Terminal (TCOT) 24″ Main Oil Line For PCSB- Peninsular Malaysia Operations (PCSB-PMO) for PETRONAS CARIGALI SDN BHD
- Machining & Fabrication Workshop (AFH Master Repair) for PETRONAS GAS BERHAD – CUF
- To fabricate fischer tropsch reactor & Sampling bomb for 3GREEN GTL SDN BHD
- EPCC of new condensate tank and associated facilities at BCOT – Hot Tapping for DIALOG E&C SDN BHD
- Hot Tapping for P7124A & S Supply & Return Line for SANKYU (M) SDN BHD
- Guntong Alpha for PRO-QASEH TECHNIQUE SDN BHD
- Supply of Hydrogen Pallet for 3GREEN GTL SDN BHD
- Hot Tapping for Chemical Injection Skid for GROWTH AVENUE SDN BHD
- Provision of ERB West & Tembungo Chemical Injection Point Tie-In & Relocation using Hot Tapping method for PETRONAS CARIGALI Sdn Bhd – Sabah Operations for PETRONAS CARIGALI SDN BHD
- Supply of Material for MSET ENGINEERING CORPORATION SDN BHD
- Provision of manpower, materials, equipment, tools, consumables, painting, testing, and electrical works for 3GREEN GTL SDN BHD
- Replace Chemical Skid & GRE piping for PETRONAS GAS BERHAD
- Replace canteen LPG Pipeline for KERTEH PORT SDN BHD
- Supply of Flange & Gasket for TANJUNG OFFSHORE SDN BHD
- Provision of pipeline process corrosion monitoring facilities via Hot Tapping method at Semarang Platforms for PCSB-SBO for PETRONAS CARIGALI SDN BHD
- Provision of manpower, materials, equipments, tools, consumables, NDT -10%, Hydrotest, Acid Cleaning, and Installation for 3GREEN GTL SDN BHD
- NPS 36 PGU I, Verification Dig-up & Repair for PETRONAS GAS BERHAD
- Repair & Rehab NPS 8 PGU C3 & C4 for PETRONAS GAS BERHAD.
- Engineering, Procurement, Construction for PETRONAS GAS BERHAD
- Repair & Rehab for NPS 36 Loop 1(Ktn RO) for PETRONAS GAS BERHAD
- Repair & Rehab for NPS 36 Loop 1(Ktn CS) for PETRONAS GAS BERHAD
- Repair & Rehab for NPS 36 Loop 1(Ktn RO-Add) for PETRONAS GAS BERHAD
- Rep & Rehab NPS 36 PGU Loop 1 (Kerteh) for PETRONAS GAS BERHAD
- PGUII Sector III 2 Weldments Repair. (Tenang Project- 30″) for PETRONAS GAS BERHAD
- PGUII SectIII Weldment Rep (1 Point)- (30″ Segamat) for PETRONAS GAS BERHAD
2010
- Provision of Personnel, Equipment and material for Living Quarters repair and Maintenance Services (1+1 Contract) for EXXONMOBILE EXPLORATION AND PRODUCTION
- Replace of Hot water LQ piping for EXXONMOBILE EXPLORATION AND PRODUCTION
- IBA – Kitchen Work Pack for EXXONMOBILE EXPLORATION AND PRODUCTION
- Irong Barat A for EXXONMOBILE EXPLORATION AND PRODUCTION
- Rental Storage container for EXXONMOBILE EXPLORATION AND PRODUCTION
- Jea-Living Quarters urinal bowl clogged for EXXONMOBILE EXPLORATION AND PRODUCTION
- Repair and Restoration proposal for EXXONMOBILE EXPLORATION AND PRODUCTION
- Living Qrts repair – Larut A for EXXONMOBILE EXPLORATION AND PRODUCTION
- Perform Living Qtrs Repair for EXXONMOBILE EXPLORATION AND PRODUCTION
- Living Qrts repair & maintenance for EXXONMOBILE EXPLORATION AND PRODUCTION
- Provide manpower to survey LQ restoration work at Seligi A for EXXONMOBILE EXPLORATION AND PRODUCTION
- LQ restoration work at Guntong A for EXXONMOBILE EXPLORATION AND PRODUCTION
- LQ Storage Yard – CAR/Container for EXXONMOBILE EXPLORATION AND PRODUCTION
- IBA-Additional Living Quarters for EXXONMOBILE EXPLORATION AND PRODUCTION
- Manpower for survey for EXXONMOBILE EXPLORATION AND PRODUCTION
- TMM crew for LQ repair and maint serv for EXXONMOBILE EXPLORATION AND PRODUCTION
- Estimated Manpower cost for EXXONMOBILE EXPLORATION AND PRODUCTION
- To fabricate Chemical Pump Frame for NEWFIELD PENINSULA MALAYSIA INC
- Painting work – External wall for KERTEH TERMINALS SDN BHD
To ferurbish cargo handling equipment for PETRONAS CARIGALI SDN BHD - Additional 2 Hottaps at Melut Basin oil Dev Project for PETRONEEDS SERVICES INTERNATIONAL
- Hot Tapping Tank 3003A/B for PETRONAS PENAPISAN (T) SDN BHD
- To fabricate blank liner come with a seal for PETROFAX (MALAYSIA-PM304) LIMITED
- Construct two paste oil recovery tank (Grey Color) incl all fittings & two M-4 Wilden Pumps for NEWFIELD PENINSULA MALAYSIA INC
- To Service XV-3121 for VINYL CHLORIDE MALAYSIA SDN BHD
- Supply, install & servers Main Control Building for PETRONAS GAS BERHAD
- Structure modification at Duyong Service Platform for TRISYSTEM FLOW PRODUCT SDN BHD
- Provision to supply topside structure maintenance – Portable water piping at Bra-WR 0172 for OFFSHORE CONSTRUCTION & ENG. SDN BHD ( TALISMAN)
- Preliminaries (Consumables, Insurance, Mobilisation, and Etc.) for OFFSHORE CONSTRUCTION & ENG. SDN BHD ( TALISMAN)
- Provision to supply manpower, equipment, tools, consumables, and materials for Tile repair for OFFSHORE CONSTRUCTION & ENG. SDN BHD ( TALISMAN)
- Provision of manpower survey at Talisman Platform for OFFSHORE CONSTRUCTION & ENG. SDN BHD ( TALISMAN)
- Provision to supply of equipment for potable water piping project for OFFSHORE CONSTRUCTION & ENG. SDN BHD ( TALISMAN)
- Provision to supply manpower portable water piping (WR 0172) for OFFSHORE CONSTRUCTION & ENG. SDN BHD ( TALISMAN)
- Hot Tapping Service & Supply Hot Tap Fitting for PETRA RESOURCES SDN BHD
- To extend building for substation 1 for PETRONAS PENAPISAN (T) SDN BHD
- To fabricate and install workshop awning for PETRONAS GAS BERHAD
- POB Cardholder boxes for NEWFIELD PENINSULA MALAYSIA INC
- Hot Tapping works at KBC for KEMAMAN BITUMIN COMPANY SDN BHD
- NPS 10 ‘” SSL Tee Replacement for PETRONAS GAS BERHAD
- Installation of new raw water pump 2P-3300 B at Titan , Pasir Gudang- Hot Tapping Works for KEJURUTERAAN SBC SDN BHD
- Fittings, Flange, Gen for PETRONAS GAS BERHAD
- Supply manpower, material and equipment for Hot Tapping work for water Stripper Feed Pump Upgrading at Ethylene (M) Sdn Bhd. for HSE RESOURCES SDN BHD
- Repair of railing at Control Tower for KERTIH PORT SDN BHD
- Flare Gas Measurement (OGT) for TRISYSTEM FLOW PRODUCT SDN BHD
- 25 Units of Nyatoh Lockers for Terminals male Changing for KERTIH TERMINALS SDN BHD
- Specialist pipeline (Additional for NPS 10 Feed condensate for PETRONAS GAS BERHAD
- Provision of Nitrogen during RECOM & DEC for PETRONAS GAS BERHAD
- Tape , P.T.F.E Thread Seal for PETRONAS DAGANGAN BERHAD
- To fabricate blinding materials for VINYL CHLORIDE MALAYSIA SDN BHD
- Supply of Launcher Receiver for Seligi Intrafield and semangkok pipeline for MSET ENGINEERING CORPORATION SDN BHD
- Provision of Hot Tapping Services for Betty Re-Site 4 Project for PETRA RESOURCES SDN BHD
Flare Gas Measurement (OGT) for TRISYSTEM FLOW PRODUCT SDN BHD - Supply of Launcher Receiver for fairley baram 6″ gas lift pipeline 6″ multiphase pipeline for MSET ENGINEERING CORPORATION SDN BHD
- To supply, fabricate & install full wall fencing for MISC INTEGRATED LOGISTICS
- Modification of CDB piping for PETRONAS GAS BERHAD
- Hot Tapping works at Optimal for DIALOG PLANT SERVICES SDN BHD
- DLA test separator V111 repair for PETRONAS CARIGALI SDN BHD
- Trafic Office Border Painting for KERTEH TERMINALS SDN BHD
- Hot Tapping for FSK tank – 12 No for CABOT MALAYSIA SDN BHD
- Engineering & Works for YASMIN ENGINEERING SDN BHD
- Provision to fabricate stainless steel blank liners come with rubber seal for Hydrocylones optimization for Petrofac Malaysia for PETROFAC (MALAYSIA-PM304) LIMITED
- Hot Tapping work at DOX Unit A and B for ETHYLENE (M) SDN BHD
- Provision of header tapping equipment and services for PCPP facilities at D35 Paltform at Sudan for PCPP OPERATING COMPANY SDN BHD
- To install bypass line at R3-1103B for PETRONAS AMMONIA SDN BHD
- Pipe replacement @ Kapar City Gate for PETRONAS GAS BERHAD
- Supply, Fabricate and Delivery of One (1) Unit Laucher c/w End closure for Topside Project for MSET ENGINEERING CORPORATION SDN BHD
- Engineering, Procurement, Construction, Installation and Commissioning Modification of Bypass Valve and Piping for EMSB take-off Valve at EMSB take -Off Valve Station via Hot Tapping for PETRONAS GAS BERHAD
- EPCC Of installation of the online analyzer for moisture, HCDP & H2S at Segamat Scrapper Launcher for HYPERWAVE SYSTEMS SDN BHD
- Hot Tapping point work for Gebeng City Gate for PETRONAS GAS BERHAD
- Provision of personnel, Chemicals, and Equipment to perform Chemical Cleaning on cooling water system (CWS) on Larut A for EXXONMOBILE EXPLORATION AND PRODUCTION
- Verification dig up & repair for NPS10 FEC for PETRONAS GAS BERHAD
- Fabricate Spacer for HPRT for PETRONAS GAS BERHAD
- NPS 10″ SSL Tee Replacement for PETRONAS GAS BERHAD.
- Verification digs up & repair for NPS10 FEC for PETRONAS GAS BERHAD.
2009 - 2013
- Price Agreement for Rehabilitation and Repairs works for PGB-TOD pipeline system for Three (3) years with an option to extend for another one (1) years for PETRONAS GAS BERHAD
2009
- Norther field cold cutting/drilling services (Hot Tapping) for CARIMIN ENGINEERING SERVICES SDN BHD
- Old Support need to remove for VINLY CHLORIDE (M) SDN BHD
Additional work for modification spool for vecs for KERTEH TERMINALS SDN BHD - Replace & repair hose box at VCMSB Plant for VINLY CHLORIDE (M) SDN BHD
- EPCC services to install new demin water pump P-3301B and 2P-3301 B at utility area, cracker-1 & Cracker -2 plants in Titan (Hot Tapping Works) for SRI TAKADE INDUSTRIES (M) SDN BHD
- GRE works fabrication and installation for PFC ENGINEERING SDN BHD
- Price Agreement for Rehabilitation and Repairs works for PGB-TOD pipeline system for Three (3) years with an option to extend for another one (1) years. for PETRONAS GAS BERHAD
- The proposed to design,construction , testing and commisioning of one (1) unit new intergrated fire simulator complete with other related works for CEFS response training ground, Tok Arun for CEFS-RESPONSE SDN BHD
- Bottom Half Sleeve of TDW for GAS MALAYSIA SDN BHD
- ISW NO.1 (PA Rehabiliation ) for PETRONAS GAS BERHAD
- NSR-034 Fabricate Liner pipe & Install for VINLY CHLORIDE (M) SDN BHD
- Being Rental of One (1) unit Portable Liquid Flow Meter for WARGA HIKMAT KEJURUTERAAN SDN BHD
- NPS 30 Pgu 2 sector 3 repair (Labis Project) for PETRONAS GAS BERHAD
- Supply of two (2) units of receiver for Dulang Gas Development Project for MSET ENGINEERING CORPORATION SDN BHD
- ISW NO.1 (PA Rehabilitation ) for PETRONAS GAS BERHAD
- Metallic Structural / piping for VINLY CHLORIDE (M) SDN BHD
- NPS 30 Senoko Lateral (PA Rehabilitation) for PETRONAS GAS BERHAD
- Repair Rehab NPS 8 Propane (3 pts) for PETRONAS GAS BERHAD
- NPS 20 Paka Lateral (1 Point) for PETRONAS GAS BERHAD
- Repair Rehab NPS 24 Prai for PETRONAS GAS BERHAD
- Bekok Leak -NPS 30 PGU 2Sec 3 (Emergency Pipeline) for PETRONAS GAS BERHAD
- Dig-up NPS 4 Poly Plastic (Mob-Demob) for PETRONAS GAS BERHAD
- Dig-up NPS 2 KSMF (Mob-Demob) for PETRONAS GAS BERHAD
- To fabricate and Supply of test tank for CEFS-RESPONSE SDN BHD
- Procedure for DIALOG PLANT SERVICES SDN BHD
- Fabrication for EXXONMOBILE EXPLORATION AND PRODUCTION
- Renovation works for TCB Traffice Office & Locker Room for KERTEH TERMINALS SDN BHD
- Provision of Personnel, Equipement and material for Living Quarters repair and Maintenance Services (1+1 Contract) for EXXONMOBILE EXPLORATION AND PRODUCTION
- Survey at IBA LQ for RFS-TMM 01/09
- Work Execution for GU-D for RFS-TMM 02/09
- To rectify leaking urinal bowl at TA-B for RFS-TMM 03/09
- To Clear 40% punclist work at TA-C for RFS-TMM 04/09
- Additional work for Gu-D for RFS-TMM 05/09
- To perform pipes repair and washroom facilities leaks for RFS-TMM 06/09
- Punhclist work at SMA for RFS-TMM 07/09
- To completed remaining wall paper installation work at Semangkok A for RFS-TMM 07/09-1
- Installation fire retardant wall paper and painting activitiy at waklway all level for RFS-TMM 07/09-Rev 1
- To perform survey work for Living Quarter repair at TAPIS A for RFS-TMM 08/09
- To develop manage, implement and setup EMEPMI Master material Management Log and material inventory management system at TMM Workshop for EMEMPI materials for RFS-TMM 09/09
- To provide storage container for EMEPMI LQ material at TMM
- Workshop for period of 6 months for RFS-TMM 10/09
- To perform LQ repair & Maintenance for RFS-TMM 10/09
- To perform LQ repair & Maintenance services at IBA such for RFS-TMM 11/09
- To perform LQ repair such for RFS-TMM 12/09
- 3 Days further discussion at KL for RFS-TMM 14/09
- To perform survey for urinal bowl leaks at washroom level 4 east side for RFS-TMM 15/09
- To replace broken floor tiles at kitchen , chiller , freezer and piping works at kicthen for RFS-TMM 16/09
- To perform Living Quarters repair work for RFS-TMM 17/09
- Hot Tapping Service for the Mechanical and Maintenance works package Area A2 (unit 21,24,26,27 & 28) for Malaysian Refinery PSR-2 Revamp Project for PFCE ENGINEERING SDN BHD
- Fabrication works for structure and piping for KAKG-Skid for MSET ENGINEERING CORPORATION SDN BHD
- 30″ Completion Plug form Ipsco c/w O-Ring for T.D WILLIAMSON ASIA PACIFIC
- Provision of Hot Tapping Services at Valves 200MV-5238A for EXXONMOBILE EXPLORATION AND PRODUCTION
Supply manpower Hot Tap Fitting for Palouge modification works – Melut Basin Oil Development Expansion Project for RANHILL INTERNATIONAL - Supply and Delivery of Hot Tap Fitting for Palouge modification works – Melut Basin Oil Development Expansion Project for RANHILL INTERNATIONAL
- Dulang B Living Quarter & Maintenance for PETRONAS CARIGALI SDN BHD
- NPS 18 Sepang Lateral Verification Dig-up for PETRONAS GAS BERHAD
- Sepang verification dig-up : TMP for PETRONAS GAS BERHAD
To Rental of Portable Liquid flow Meter for WARGA HKMAT KEJURUTERAAN SDN BHD - Offshore Hook-up and Commissioning of D30 and Dana Wellhead support frames (WHSF) and D35 Host Tie-In for D1 Cluster Development Project for SHAHPADU ENERGY & ENGINEERING SDN BHD
- TopSide Piping & Structral (To do wraping @ BEG Gas Cooler Outlet) for PETRONAS CARIGALI SDN BHD
- 6″ x 3″ Full Encirclement Split Sleeve Hot Tap Tee c/w Branch Flanged 2″ x 150# ANSI RF-WN for DIALOG PLANT SERVICES SDN BHD
Supply of Hot Tap fittings – Melut Basin Expansion Project at Sudan for RANHILL INTERNATIONAL - TCR & CR add Renovation work for KERTEH TERMINALS SDN BHD
- Hot Tapping Works – Melut Basin Expansion Project at Sudan for RANHILL INTERNATIONAL
- Flare Gas (OGT) for TRISYSTEMS FLOW PRODUCTS SDN BHD
Supply of Manpower Survey at Talisman Platform for OFFSHORE CONSTRUCTION & ENGINEERING S/B - Tape Safety & Manpower for TRISYSTEMS FLOW PRODUCTS SDN BHD
- MTBE Dry Gas Seal Upgrading Project- Hot Tapping for MTBE MALAYSIA SDN BHD
- Hot Tapping Service for the Mechanical and Maintenance works package Area A2 (unit 21,24,26,27 & 28) for Malaysian Refinery PSR-2
- Revamp Project for DIALOG PLANT SERVICES SDN BHD
- AMOC 379 Mercury Sampling Shelter for PETRONAS AMONIA SDN BHD
- Supply of Split Tee for RANHILL INTERNATIONAL
- Fabricate Fan Guard Motor for EXXONMOBILE EXPLORATION AND PRODUCTION
- Provision of WH 4 Cabin Renovation – KSB for PETRONAS CARIGALI SDN BHD
- Provision to perform a double block and Hot Tapping for Sotong collector platform for PETRONAS CARIGALI SDN BHD
- Upgrade Logistics Surau & Rest Room for ETHYLENE (M) SDN BHD
- NPS 30 Pgu 2 sector 3 repair (Labis Project) for PETRONAS GAS BERHAD.
2008
- WELDING OF 8” X 4” HOT TAPPING FITTING ONTO 8” EXISTING LINE & RELATED WORK for A. I TOTAL ENGINEERING SDN BHD
- 2” PIPELINE TO TRANSFER VECS EFFLUENT FROM KTSB TO AMSB for KERTIH TERMINAL SDN BHD
- PROVISION TO SUPPLY RB211 CONTAINER for PETRONAS CARIGALI SDN BHD
- ADDITIONAL WORKS ON MULTIPURPOSE HALL for PETLIN
- HOT TAPPING SERVICES for ETYHLENE ( MALAYSIA ) SDN BHD
- KERJA-KERJA MEBAIKIPULIH TANAH YANG MENDAP DAN MEMBAIKI LONGKANG DI KAWASAN RUMAH NO 1 for PETROLIAM NASIONAL BERHAD
- PROCUREMENT, CONSTRUCTION , INSTALLATION AND COMMISSIONING OF SIGLE SPOOL 30 INCH AT SEGAMATA SCAPER YARD for PETRONAS GAS BERHAD
- SUPPLY OF FILTER ELEMENT for EXXONMOBIL
- PROVISION TO FABRICATE SOLAR MARS GAS TURBINE EXPANSION JOINT FOR DUYONG-B PLATFORM for PETRONAS CARIGALI SDN BHD
- EPCC OF NGDS TO JOHOR JAYA FL STAGE 1/07 TAMAN JOHOR JAYA, JOHOR for A. I TOTAL ENGINEERING SDN BHD
- EPCC OF NGDS TO JOHOR JAYA FL STAGE 2/07 TAMAN JOHOR JAYA, JOHOR for A. I TOTAL ENGINEERING SDN BHD
- HOT TAPPING SERVICES ( 6” 150# ONTO B” ) AT PP(M)SB, MELAKA for STREAMLINE ( MALAYSIA )SDN BHD
- UOA LUBE OIL SHED AT GPP1 for PETRONAS GAS BERHAD
- INSTALL WIRE /GLASS DOOR AND WINDOW for PETLIN SDN BHD
- TO SUPPLY AND INSTALL VENTILATION ROOF for PETLIN SDN BHD
- TO CONSTRUCT CONCRETE SLAB-CYLINDER AREA for PETLIN SDN BHD
- REPAIR ACTIVITY AT INTEGRATED WAREHOUSE for PETLIN SDN BHD
- XV-3332 DRAIN VALVE REPLACEMENT for VINYL CHLORIDE SDN BHD
- PROVISION TO SERVICES & REPLACE IP PART- Refurbish of Valve Size Ball Valve during OGT Shutdown Feb 2008 for PETRONAS CARIGALI SDN BHD
- THE DESIGN, ENGINEER, SUPPLY, MANUFACTURE, TEST, AND DELIVERY OF FUEL GAS SKID FOR PC4 DEVELOPMENT PROJECT FOR PETRONAS CARIGALI SDN BHD for MSET ENGINEERING SERVICES SDN BHD
- SUPPLY & PROVIDE HOT TAP SPECIALISTS, TAPPING EQUIPMENT AND TOOL TO PERFORM 4 NUMBER OF HOT TAP SERVICES for AQEEL ENGINEERING & CONSTRUCTION SDN BHD
- EPCC OF GPRW AT LOT 5581, JALAN KULAI -AYER HITAM , KULAI, JOHOR -HOT TAPPING WELDING SERVICES for SAAG INFRASTRUKTUR ( M ) SDN BHD
- ENGINEERING, PROCUREMENT, AND CONSTRUCTION( EPC ) SERVICES FOR EMEPMI RETROFIT AND HOST-TIE PROJECTS for INTRALINE RESOURCES SDN BHD
- Hot tapping works for work package no GU06166 at Optimal for DIALOG PLANT SERVICES SDN BHD
- Provision of Hot Tap Supply at Dulang for PETRONAS CARIGALI SDN BHD
- Supply of Launcher / Receiver for PCSB Samarang Pipeline
- Replacement Project for SPH for MSET ENGINEERING CORP SDN BHD
- Supply of Launcher / Receiver for PCSB Samarang Pipeline
- Replacement Project for SPH (Additional Works) for MSET ENGINEERING CORP SDN BHD
- Provision of supply Drain Cover for KOP Mustering for PETRONAS CARIGALI SDN BHD
- Fabricate and Install Service Platform for TOX Axial Fan for PETLIN (M) SDN BHD
- Decomm & Recomm NPS 8 C4 M1 to MTBE for PETRONAS GAS BERHAD
- Replace 9 unit Pressure Relief Valve for Kerteh LPG Bottling for PETRONAS DAGANGAN BERHAD
- Supply of power gas system skid for ANGSI Phase IV Development Project for MSET ENGINEERING CORP SDN BHD
- Fabricate motor cover housing for EXXONMOBIL
- To fabricate & install 3x RHW Drain Points for PETLIN (M) SDN BHD
- Import Soil for PETRONAS GAS BERHAD
- Pipeline to transfer VECS Effluent from KTSB To AMSB for KERTIH TERMINAL SDN BHD.
- The procurement, installation, and commissioning of the Mechanical package for the Storm Water Drain improvement project at GPP-A, Kerteh, Terengganu for PETRONAS GAS BERHAD.
2007
- New add platform at STR–1402 A/B/C for VINYL CHLORIDE (M) SDN BHD
- Verification Dig-up propane, butane PGU 1, Verification Dig-Up for NPS 8 Propane PGU 1 for PETRONAS GAS BERHAD
- SS piping replacement A3-401 to L3-452 for PETRONAS GAS BERHAD
- Install Block Valves in HP steam Line- Hot Tapping for OPTIMAL CHEMICAL (M) SDN BHD
- Rehabilitation and repair C3, C4 Feet CT for PETRONAS GAS BERHAD
- Verification Dig-up and repair for PETRONAS GAS BERHAD
- Lab Extension / Renovation for VINYL CHLORIDE (M) SDN BHD
- Pembaikian Paip air utk B6 for KERTEH PORT SDN BHD
- Manpower Supply for BASF Shutdown for CONTRACT RESOURCES PETROCHEM (M) SDN BHD
- Maintenance Of marine hose assembly/disassembly equipment by EXXONMOBILE EXPLORATION AND PRODUCTION MALAYSIA INC
- Shudown at BASF Gebeng for ESSMART SYSTEMS SDN BHD
- Supply manpower for VCM Job for MERANG ENGINEERING SDN BHD
- To build a new multi Purpose Hall for PETLIN (M) SDN BHD
- Install perimeter Fencing for KERTEH TERMINALS SDN BHD
- To supply hot tapping services for ETHYLENE MALAYSIA SDN BHD
- To fabricate and install hoarding for CUF PETRONAS GAS BERHAD
- Provide Hot Tap Specialists, Equipment and Tools perform 3 numbers of Hot Tap Service Job for MUSHTARI ENGINEERING & TRADING SDN BHD
- To fabricate diagram for PETRONAS GAS BERHAD
- MG3 LUBE BASE OIL PROJECT AT PPMSB-HOT TAPPING PACKAGE for KEJURUTERAAN QKS SDN BHD
- MSD07-PF# Top Main Beam Replacement for HUNTSMAN TIOXIDE (M) SDN BHD
- Verification Digup NPS12 Butane GPPB-B2 for PETRONAS GAS BERHAD
- Verification Digup NPS36 PGU I for PETRONAS GAS BERHAD
- Cold Tapping Services for F6 Rejuvenation Project for SARAWAK SHELL BERHAD
- WPS rental for SHAH ELECTRIC & INSTRUMENT ENGINEERING SDN BHD
- To supply Portable Toilet for VINYL CHLORIDE (M) SDN BHD
- New Security BARS at ROW 2 fence for KERTEH TERMINALS SDN BHD
- Rehabilitation and repair NPS 6 C4 PGU II for PETRONAS GAS BERHAD
- Rehabilitation and repair NPS 6 C3 PGU II for PETRONAS GAS BERHAD
- Rehabilitation and repair NPS10 Feed Co for PETRONAS GAS BERHAD
- Fabrication of Piping Cage From E501 to P505 for VINYL CHLORIDE (M) SDN BHD
- Preparation, remove of existing welding, welding of a new base plate, drilling of new holes for rails for ADNRITZ SEPARATION GMBH
- To carry out repair works on Nozzle No 4 for G Gas Filter (F101B) at Bintulu Edible Oil Sdn Bhd Station for PETRONAS GAS BERHAD
- Access Road HI Grade at Polisher / Demin for ETYLENE MALAYSIA SDN BHD
- Pavement Block for UOM Plant / Flare for ETYLENE MALAYSIA SDN BHD
- To supply manpower for UT flow meter for KEJURUTERAAN QKS SDN BHD
- Fabrication middle shell trolley R1201 for VINYL CHLORIDE (M) SDN BHD
- SS piping replacement A3-401 to L3-452 for PETRONAS GAS BERHAD
- Hot Tapping Services Additional for RAMUNIA FABRICATORS S/B
- Hot Tapping Services at TITAN Petchem for WING HUP ENGINEERING & CONSTRUCTION SDN BHD
- Provision to supply manpower, equipment /tools, and consumables for soil cleaning project at Petronas Dagangan Pasir Gudang for ECO – LOGIX (M) SDN BHD
- EPCC modification of Bypass Installation at Kuantan Compressor Station for PETRONAS GAS BERHAD
- RES 1346-Add piping for seal pot P2112 for POLYPROPLENE (M) SDN BHD
- Inspection and Testing of LPG piping System for THE NEW STRAITS TIMES PRESS
- Supply Hot tapping Fitting 12″ x 12″ 300# for WARGA HIKMAT KEJURUTERAAN
- To fabricate a new reducer for VINYL CHLORIDE (M) SDN BHD.
- Clockspring Installation NPS 14 Propane for PETRONAS GAS BERHAD
- Pipe replacement for NPS 18, Perlis Lateral for PETRONAS GAS BERHAD
- To supply material, fabricate, weld, paint, suitable protect and delivery the racks for EXXONMOBILE EXPLORATION AND PRODUCTION MALAYSIA INC
- Fabricate Nameplate for INTRALINE RESOURCES SDB BHD
- Ammonia Vent Station Platform Grating, Fall Protection for KERTEH TERMINALS SDN BHD
- To supply, replace, and testing 3/4” pipeline for THE NEW STRAITS TIMES PRESS
- Ethylene-Supply, deliver & install a heater for backwash water for HEXAGON TOWER SDN BHD
- To supply material/part and to erect scaffolding for electrical works at Kerteh LPG depot for PETRONAS DAGANGAN BERHAD
- RT work for NPS 10 Feed Cond Pipeline for PETRONAS GAS BERHAD
- By Pass Via Hot Tapping Method for LOCAL ENGINEERING ( M) SDN BHD
- Hot Tapping Services ( 1 nos of 3” onto 3” Line ) for GSES SYSTEM ENGINEERING SERVICES SDN BHD
- Structural work and Hottapping for TRISYSTEM SDN BHD
- Hot tapping works for PETRO WATER ENGINEERING
- Hottaping works for CUF PETRONAS GAS BERHAD
- Scraper Receiver & Launcher for MSET
- Fender B1 Emergency Repair for Kertih Port Sdn Bhd
- Scraper Receiver & Launcher for MSET
- To Construct a 1×1 meter x 6” thick concrete plinth for the new LEV system’s fan blower skid at Lot N for Kertih Terminal Sdn Bhd
- Additional work for Fender 1 emergency repair for Kertih Port Sdn Bhd
2006
- Procurement, Construction, and Commissioning for the Modification of Sulphur Bed Units at GPP 3 with an Option of GPP 2 and DPCU 2 for PETRONAS GAS BERHAD
Service and maintenance fender at KPSB for KERTEH PORT SDN BHD
Singapore Pipeline Project – Plentong 24″ x 30″ Hot Tap Welding for TECHNIC DATA WORKS (M) SDN BHDInstallation -Drinking Water Line PVC-CCB for VINYL CHLORIDE (M) SDN BHD
To engage contract for pipe spool fabrication at Optimal meter station for PETRONAS GAS BERHAD
Contract for the Procurement, Construction and Commissioning for the Modification of Sulphur Bed Units at GPP 3 for PETRONAS GAS BERHAD
Supply manpower equipment tool, consumables, and material c/w works for fabrication for VELOSI (M) SDN BHD
Rehab/Repair NPS 36 Paka Loop for PETRONAS GAS BERHAD
To perform Leak Rectification & Completed fabrication on defect piping and flanges – GPP 4 for PETRONAS GAS BERHAD
Monsoon Drain Repair at EPMESB area for ETHYLENE (M) SDN BHD
Hot Tapping Welding Works for RIGHT GAS SDN BHDGas Compressor By-Passing Modification works at TNB Power Station, Port Dickson for PROTANK EBT SDN BHD
Installation 1 nos of Pressure Gauge (PG). Temperature Gauge (TG) and Sampling Point at Cooling Water Return Line and to Install 1 nos of Temperature Gauge (TG) at Cooling Water Supply Line at VCM, Plant. for VINYL CHLORIDE (M) SDN BHD
Hot Tapping Welding Works for ETHYLENE (M) SDN BHD
Hot Tapping Welding Works for Petronas Dagangan Labuan . TP01:14″ x 8″ 150# for TOTAL MAINTENANCE RESOURCES SDN BHD
Hot Tapping Works at TNB Power Station, Port Dickson, Negeri Sembilan (Hot Tapping Fittings) for PROTANK EBT SDN BHD
Provision to perform mech, work, internal at KCS for PETRONAS GAS BERHAD
Hot Tapping Works at TNB Power Station, Port Dickson, Negeri Sembilan (Hot Tapping Boring) for PROTANK EBT SDN BHD
To Supply Steel Plate for VINYL CHLORIDE (M) SDN BHD
Construction Facilities for Turn Around Village for VINYL CHLORIDE (M) SDN BHD
The provision of Manpower, Equipment, Tools, Transportation and Consumable for Leak Sealing Services – Term Contract for PETRONAS AMMONIA SDN BHD
Seal Leak at PICA-1231B Flange for RO1
Seal Leak at PICA-1802 Flange for RO2
To reinject sealing compound for RO3
End Blind U/S of IBD leaking for RO4
Verification Dig – Up and Repair for PETRONAS GAS BERHAD
Onsite Hot Tapping boring ton Hot Tap nozzle onto the existing line for AQEEL ENGINEERING & CONSTRUCTION SDN BHD
Pipeline Rehabilitation & Repair Nps 6 Propane II, Nps 10 Feed Condensate for PETRONAS GAS BERHAD
Repair Work on VCMSB-K-1851 On the Blower Casing for SERBA DINAMIK SDN BHD
Repair Work for SERBA DINAMIK SDN BHD
Term Contract for Civil and Building Services at Petlin Sdn Bhd for PETLIN (M) SDN BHD
Isolation Spade and Gasket to TOX & Manpower Supply for RO1
To fabricate Platform at Bag Flattener for RO2
To remove existing rain gutter – comp hous for RO3
To repair PVC rainwater downpipe for RO4
To Install tempered glass single swing door for R05
Replace / Install new clear glass for R06
Replace / Install Tinted Mesh Glass for R07
To Install Door Locking System at ctrlrm for R08
Repair Concrete Slab at Analyser for R09
To repair concrete gutter for initiator for R010
Add / Repair Concrete Slab – Analyzer House for R011
Demolish Retaining Bund Support for R012
F/Install / New steel Door / Rail Guard for R013
Install Toilet Equipment at CTRL room for R014
Install Tap Shower at Maintenance Building for R015
HSE statistic Board Casing and Shed for RO16
Fabricate & Install New SS304 SINK for RO17
To repair admin Roof & parking Shed for R018
Installation of Toilet equipment for R019
Supply manpower, equipment to fabricate valve for R020
To install New Door Lock & Padlock for R021
Repair Casing Delta Blower for R022
Dismantle of GT Exhaust plenum roofing at CUF, Gebeng for SERBA DINAMIK SDN BHD
Hot Tapping Welding Works for RIGHT GAS SDN BHD
Engineering, Procurement, Construction, Installation for YTL Paka and YTL Pasir Gudang metering Station for PETRONAS GAS BERHAD
Fabrication Filters Caps, Holder & Spring for PETRONAS GAS BERHAD
Monsoon Drain Repair at Jln A;19,13,14 for ETHYLENE (M) SDN BHD
Contract for the Procurement, Construction and Commissioning for the Modification of Sulphur Bed Units at GPP 2 and DPCU 2 for PETRONAS GAS BERHAD
Fabricate Flexible Metal Hose & Stock Bushing for EXXON MOBILE
Fence Upgrading Work at KPSB for KERTEH PORT SDN BHD
Fabricate of Scaffolding Base Plate for SAENG-SAENG RESOURCES S/B
Engineering, Procurement & Construction for Replacement of Existing Ladder & Platform of T1703 Propylene Tank To Grating Type & Ancillary Works for MTBE (M) SDN BHD
Disposable of Trash outside VCMSB for VINYL CHLORIDE (M) SDN BHD
Hot Tapping-Mid Valley, Mega Mall TP01: 24″ X 16″ 150#, TP01 16″ 150# for TOTAL MAINTENANCE RESOURCES SDN BHD
Hot Tap for re-route of the line at between Jln SS9/2 & SS9/10 to Cycle & Carriage for MMCE
To fabricate Hose Cabinet for EXXON MOBILE
Replacement Butterfly Valve Gate Valve ( 4″ with 6″) for VINYL CHLORIDE (M) SDN BHD
Venting Line for PETLIN (M) SDN BHD
Bucket Strainer for PETLIN (M) SDN BHD
Pembekalan dan Pemasangan Fender Pads di jeti MSCB for KERTEH PORT SDN BHD
Routine Maint Inspection for KERTEH TERMINALS SDN BHD
Flange Leak repair at Pondok Labu CG for PETRONAS GAS BERHAD
Provision of Hot Tapping Work for CFU Test Unit at Dulang B for VASTALUX SDN BHD
Provision of Manpower, Machinery, Equipment, Tools, and Consumables for the Hot Tapping Works for Kuantan Compressor Station Expansion Project for SIME ENGINEERING SDN BHD
Hot Tapping Services at PPMSB for DIALOG PLANT SERVICES SDN BHD
To supply /provide Hot Tap Specialist, Tapping Equipment & Tools to perform 3 Number of Hot Tapping Services for TR28 Phase 2 Implementation project as below: for ENSPROSERVE ENGINEERING S/B
Provision of Hot Tapping Work At Dulang B Platform Supply of Hot Tap Fittings & Ball Valve for VASTALUX SDN BHD
To supply sufficient manpower, materials, consumables, and others to supply one unit of an open shed for contractor waiting area at EMPEMSB for ETHYLENE (M) SDN BHD
- Contract for Procurement, Install & commissioning of various piping and mechanical inspection for MTBE & PPM reliability project for POLYETHYLENE (M) SDN BHD
- Provision of Manpower, Machinery, Equipment, Tools, and Consumables for the Hot Tapping Works for Segamat Compressor Station Expansion Project for SIME ENGINEERING SDN BHD / PETRONAS GAS BERHAD
- Provision of Manpower, Machinery, Equipment, Tools, and Consumables for the Hot Tapping Works for Kuantan Compressor Station Expansion Project for SIME ENGINEERING SDN BHD / PETRONAS GAS BERHAD
2005
To Fabricate Belt Tensioner for PETRONAS CARIGALI SDN BHD
Fabricate Lub Oil Rack for VINYL CHLORIDE (M) SDN BHDTo replace pipe at R-301A/B/C/Dvent line, to replace piping at reactor vent line for VINYL CHLORIDE (M) SDN BHD
Servicing Overhaul for PETRONAS GAS BERHAD – CUF
Provision of contract for spare heat exchanger bundle shed complete with 10 ton overhead crane for PETRONAS PENAPISAN TERENGGANU SDN BHD
Installation of Zinc Anode for E-405 for KERTEH TERMINALS SDN BHD
D1 Wellhead Cum Injection Platform Project. Piping Works for ERP CORPORATION SDN BHD
Hot Tapping & Welding Works for EPCC of NGDS to Kapar – Meru FL Stage 1/04, Meru & Kapar, Klang for RIGHTGAS SDN BHD
Supply manpower, equipment, tools, and consumables to fabricate weld, NDT, HT, Blast and paint and final trial fit of filter for PETRA RESOURCES SDN BHD
Fire Damper upgrading for G-410 and G420 at Bekok-A for PETRONAS CARIGALI SDN BHD
Provision of WPS / PQR and Welder Supply. (Project GPP 1 & ET1 Rejuvenation & Revamp Project.) for CONSORTIUM OF MITSUBISHI HEAVY INDUSTRIES, LTD & SUMATEC CORPT S/B
Fabricate Strainer Bucket STR-1402A/B for VINYL CHLORIDE (M) SDN BHD
Kerja-kerja Penyenggaraan Fender di KPSB for KERTIH PORT SDN BHD
Services for installation of internal revolution (V1010) at Angsi Platform for AWOLDTECH ENGR SDN BHD
WPS / PQR / WQT for PENAGA DRESSER
Supply, Delivery, Construction, and Installation of the permanent platform and step ladder at GPP complex A, Kerteh for PETRONAS GAS BERHAD
Supply Fittings for VINYL CHLORIDE (M) SDN BHD
Rental Pressure Recorder for SHAHPADU
NPS 36 Paka Loop ( 4 / Pcs) for PETRONAS GAS BERHAD (ISW 01)
NPS 36 Defect Verification for PETRONAS GAS BERHAD (ISW 02)
Manpower Supply- Welder for PETRA RESOURCES SDN BHD
Hot Tapping Works For Redline-II for SUMATEC CORPORATION SDN BHD
Welding of Hot Tapping Fitting for EPCC of NGDS to KEE FATT
Industries, Kulai Johor for RASLOW SDN BHD
Welding of Hot Tapping Fitting for EPCC of NGDS to Comfort Rubber
Glove Plant 2, Kemunting for RASLOW SDN BHD
To conduct WQT/ Simulation test (to record welding parameters) for the longitudinal & circum ferencial weld in accordance to API standard 1107 requirement and specifications. WPS REF #015-02 & 016-02 for RASLOW SDN BHD
Welding of Hot Tapping Fittings for EPCC of NGS to Tampoi and Larkin, Johor for RASLOW SDN BHD
Material manpower to repair 2 units C/T to perform and complete refurbishment of two (2) units cooling tower at administration building (GAC) for PETRONAS GAS BERHAD-A
Supply of TDW Hot Tapping Split Tee 16″x 4″, 300# A537 Class 1 ANS/ASMI B31-8 for Gas Malaysia NGDS to Sri Harmas for ORBTECH ENG. CORP S/B
Establish a New WPS/ PQR and WQT for AWS D1.1 for TECH CENTRE ENG. SDN BHD
Turn Around Modification Project ss(5 Items) for VINYL CHLORIDE (M) SDN BHD
REHABILITION-ISW No.2 2005/2006 for PETRONAS GAS BERHAD
Element & Strainer for VINYL CHLORIDE (M) SDN BHD
HOT TAPPING for NEWWIN ENGINEERING SDN BHD
To Install monorail @ PSA shelter for GPP Complex B for PETRONAS GAS BERHAD
ECC Renovation – Radio Room Renovation for PETRONAS CARIGALI SDN BHD
Fabricate Complete Strainer at STR-1402B for VINYL CHLORIDE (M) SDN BHD
Piping & Mechanical Work for MAMPAN JITU(M) SDN BHD
Hot Tapping at Optimal for DIALOG PLANT SERVICES S/BTo modify N2 gas cage & Fab 02 gas cage for VINYL CHLORIDE (M) SDN BHD
Repair / Replace Damaged 6″ PVC Drain for PETLIN (M) SDN BHD
Welding of Hot Tapping Fitting 6″ X 4″ 300# at Jalan Meru for BUMIFOCUS SDN BHDSupply Materials (3 Items) for PETLIN (M) SDN BHD
The proposed Dismantling of Existing Fencing and construction and completion of new fencing to the Mini Recreaction Area Including Deer Farm, PPIC, Kerteh, Kemaman, Terengganu for PETRONAS EAST COAST
Hot Tapping for RIGHTGAS SDN BHD
Fabrication Mild Steel Cat Walk at Kerteh LPG for PETRONAS DAGANGAN
Civil Maintenance Works for PETRONAS DAGANGAN
16″ x 4″ ANSI 300 RF LS -2 3 Way Fitting for BROADGATE ENGINEERING (M) SDN BHD
REHABILITION-ISW No.4 FY2005/2006 for PETRONAS GAS BERHAD
Piping Modification works for Vacuum Ejector System K3-1901 for PETRONAS AMMONIA SDN BHD
Hot Tapping for EMOC 51/05 for ETHYLENE MALAYSIA SDN BHD
Piping Installation -P1302 A/B VCM Plant for VINYL CHLORIDE (M) SDN BHD- Engineering, Procurement, Construction, Installation, and Commissioning of Bypass piping and valves at PK101-BV in Kerteh Terengganu for PETRONAS GAS BERHAD.
2004 - 2007
- Price Agreement for Rehabilitation and Repair Work for PGB-TOD Pipelines system Two (2) Years with an option to extend for another one (1) Years for PETRONAS GAS BERHAD
2004
- Provision for Helium and Compress air for PETRONAS CARIGALI SDN BHD
- Proposed Construction and Commissioning of NPS 20″ Diameter Serdang Lateral Pipeline at Precinct II, Putrajaya for PB GAS SDN BHD
- Rectification work for NPS 6 PGU II Butane Pipe Leak at KP 71.2 Gebeng , Pahang for PETRONAS GAS BERHAD
- Plant Elements & Parts for VINYL CHLORIDE (M) SDN BHD
GPRW at Jln SS 7/2, Petaling Jaya for Right Gas S/b for TECHNIC DATA WORKS (M) SDN BHD - Pembekalan & Pemasangan 2 unit peti Hos Api di hadapan Bangunan Pertadbiran KPSB for KERTEH PORT SDN BHD
- Hot Tapping at Kerteh Refinery Plant for PETROTIMUR ENGINEERING SDN BHD
- Install wall cladding/weather shelter for VINYL CHLORIDE (M) SDN BHD
- S-1503 Permanent draining pipe for VINYL CHLORIDE (M) SDN BHD
- Hot Tapping welding for 2 Nos of 16″300# at Presint 11, Putrajaya for SAAG – EMBAH ENGINEERING SDN BHD
- Grating work at Fire Hydrant for KERTEH TERMINALS SDN BHD
- Welding Cable 500 amp for CORRO SHIELD (M) SDN BHD
- To perform and complete the replacement of CP-B damaged mid collector supports at Demin Water CUF Kerteh for PETRONAS GAS BERHAD – CUF
- Sampling Point for 24″/14″ CG 16086-P206 outlet line catox installation of sampling nozzle during shutdown work. for HYDROGAS (M) SDN BHD
- Provision of Hot Tapping works and By-pass pipeline for Olefin Heat
- Exchanger for OPTIMAL CHEMICALS (M) SDN BHD
- Engineering, Procurement,Construction and Commisionining of new S.A.T.U (Syarikat Air Terengganu) drinking water pipeline for Vinyl Chloride(M) Sdn Bhd for VINYL CHLORIDE (M) SDN BHD
- Fabricate Steel Stand for Exchanger OLE-E-3115 for OPTIMAL CHEMICALS (M) SDN BHD
- Contract for the Engineering , Procurement, Construction and Commissioning (EPCC) of modification at K2 station – Bypass piping for Ethane Supply to OOSB from GPP A for PETRONAS GAS BERHAD
- Station Turnaround for DOSH Inspection for PETRONAS GAS BERHAD
- Repair damaged trenches / floor VCM for VINYL CHLORIDE (M) SDN BHD
- To replace header pipe at CP-B at CUF, Kerteh for PETRONAS GAS BERHAD – CUF
- To perform 1 no. of hot taps : 12″ x 150# : 1ea for TOTAL MAINTENANCE RESOURCES SDN BHD
- Verification metal loss via DIG-UP for PETRONAS GAS BERHAD
- Supply of Material, Fabricate and Install One (1) unit of reinforced set branch for Hot Tapping 10″ PSV 508 Discharge Line to flare header for EMOC 044/04:H2 to PASB tie-ins project during Minor T/A in Oct 2004 for ETHYLENE MALAYSIA SDN BHD
- Trans Thailand -Malaysia (TTM) project gas pipeline onshore pipeline system (Malaysian Portions) – Hot Tap tie-ins at Changlun, Kedah for TECHNIC DATA WORKS (M) SDN BHD
- Provision of Materials, Manpower, Tools, and Equipment to perform Hot Tapping Service (16 x 4) – Gas Malaysia NGDS to Sri Hartamas for ORBTECH ENGR CORP SDN BHD
- To Fabricate Fan Blade for PETRONAS CARIGALI SDN BHD
Price Agreement for Rehabilitation and Repair Work for PGB-TOD Pipelines for PETRONAS GAS BERHAD - Booster Pump-Mech , piping and civil work for VINYL CHLORIDE (M) SDN BHD
- EPCC of modification at K2 station – Bypass piping for Ethane Supply to OOSB from GPP A for PETRONAS GAS BERHAD
2003
CO Compressor house roof sheeting supply and install translucent sheets in CO compressor roof for PETRONAS AMMONIA SDN BHD
Hot Tapping for OPTIMAL GROUP OF COMPANIES
Mechanical, Piping, Civil, and Structural works for G936B installation at PPTSB for PETRONAS PENAPISAN (T) SDN BHD
To supply materials, equipment, consumables, and tools for fabrication of branch for PENAGA DRESSER
REQ raiser to cover the cost of repair 4 ea bicycles for EXXONMOBILE
ST2C Interconnection Valve Online Leak Sealing for TENAGA NASIONAL GENERATION
Provision of Manpower & Equipment for Drill Trapan Hole for OPTIMAL GROUP OF COMPANIES
COD 246 – Piping for Biocide & NaOCL to cooling tower at ET plant for ETHYLENE (M) SDN BHD
Repair work at MTBE Metering Station: Permanent Sheet piling for PETRONAS GAS BERHAD
Kerja – kerja pemasangan sistem peralatan dapur di Asrama Lelaki dan Perempuan di Sek. Men Keb,Kijal, Kmn for JKR CAW KEJURUTERAAN
To perform and complete replacement of parameter fencing at Gas Processing plant complex A, Kerteh for PETRONAS GAS BERHAD
Hot Tapping work & Welding Work for PETRONAS PENAPISAN (T) SDN BHD
EPCC of a monded LPG Storage Tank at Prai Bottling Plant for PDB- Provision of DOSH Licenser for the Mechanical and piping fabrication works for PROTANK SDN BHD
Supply Manpower, Mobilization, equipment /Tools Consumables and materials for construct reinforcement concrete foundation
support and paving for AMALGAMATED METAL BUILDERSTo refurbish DLA & DLC launcher/receiver for PETRONAS CARIGALI SDN BHD
Rehabilitation works for NPS 8 PGU 1 Propane & Butane, NPS 6 for PETRONAS GAS BERHAD
PGU II Propane & butane and NPS 10 Feed Condensate Pipeline
Provision for Clock SpringModification at VCM Plant for June TA for VINYL CHLORIDE (M) SDN BHD
To Repair Collapsed Interlocking block for CENTLISED UTILITY FACILITIES (CUF)
Ring, Guide, Reformer, Larsen & Toubro for PETRONAS AMMONIA SDN BHD
Rental of Pressure Recorder for PROTANK SDN BHD
Provision of DOSH Qualification Stainless Steel (WPS/PQR) for PROTANK SDN BHD
Rental of 99.999% Helium cylinders for PETRONAS CARIGALI SDN BHD
PC for install 10″ bal Line at Deaerator for PETRONAS PENAPISAN (T) SDN BHD
Membekal , menghantar pintu pagar INSTEP for PETRONAS MANAGEMENT TRAINING
Supply of 36″ Inflatable Air Bag Stopper for BP CHEMICALS (M) SDN BHD
Replace, Modification & Install New water Filter at GPP A for EXXEC INTEGRATED (M) SDN BHD
To supply fabricate & Install Sprinkler piping System for LQ for PETRONAS CARIGALI SDN BHD
Design, Supply, Construction, and Installation of VCM tank farm walkway platform, grating cover for hydrants system, and building’s drain for KERTEH TERMINALS SDN BHD
Proposed for Installation of Zinc Anode for Bog condensate for KERTEH TERMINALS SDN BHD
Provision for Helium and Compress air for PETRONAS CARIGALI SDN BHD
- EPCC of rectification work for Scraper Launcher and receiver isolation valve of NPS 10 feed condensate pipeline for PETRONAS GAS BERHAD
- Rehabilitation works for NPS 8 PGU 1 Propane & Butane, NPS 6 PGU II Propane & Butane, and NPS 10 Feed Condensate Pipeline for PETRONAS GAS BERHAD
2002
- Repair fireproof concrete on F-1851A/B for VINYL CHROLIDE (MALAYSIA) SDN BHD
- NPS 2″ LDPE PROPANE PIPELINE for PETLIN (M) SDN BHD
- To supply fabricate and deliver 2″ nozzle to 8″ Blind Flange for KERTEH TERMINALS SDN BHD
- Element, Strainer, YAC, B- Type, 6 in, 150# for VINYL CHROLIDE (MALAYSIA) SDN BHD
- Rental of Workshop, Lorry and Supply Manpower for H.ROSEN ENGINEERING (M) SDN BHD
- Repair of Reactor for HYDROTEST SDN BHD
- Install of flanges for HYDROTEST SDN BHD
- Const of Bunded catchment @ Stadis Area for PETRONAS PENAPISAN (T) SDN BHD
- Rehabilitation work for NPS 8″ KLIA Lateral Pipeline In Sepang, Selangor for PETRONAS GAS BERHAD ( T.O.D)
- RIGHTGAS for TECHNIC DATA WORKS (M) SDN BHD
- Hot Tapping Boring at Hotel NIKKO Kuala Lumpur for TECHNIC DATA WORKS (M) SDN BHD
- Hot Tapping Boring at KLIA Sepang, Selangor for RED ARMOR (M) SDN BHD
- 2″ Jumper Line for NAM FAT ENERGY SDN BHD
- Tank External Inspection and wall thickness measurement for KERTEH TERMINALS SDN BHD
- TRV Installation at black shipping line for PETRONAS PENAPISAN (T) SDN BHD
- Hot Tap at Kluang Johor for DIVERSIFIED SDN BHD
- Fabricate support as per drawing for SHAH ELECTRIC SDN BHD
- Replace pipe leaking M610 for PETRONAS GAS BERHAD
- VCM spheres and testing of pressure safety valves at KTSB for KERTEH TERMINALS SDN BHD
- To replace T- joint V -1506 for VINYL CHROLIDE (MALAYSIA) SDN BHD
- To install add a suction line at T3101 for VINYL CHROLIDE (MALAYSIA) SDN BHD
- To Repair valve leak for DIALOG E&C SDN BHD
- Painting work for bunded & stadis area for PETRONAS PENAPISAN (T) SDN BHD
- To replace 120m 8″ pipeline at KP 11119 for PETRONAS GAS BERHAD
- Supply Manpower for OGP CONSORTIUM SDN BHD
- Leak Sealing for OPTIMAL SDN BHD
- Mechanical, Instrument & Electrical work for KR2B Plant Modification work for PETRONAS PENAPISAN (T) SDN BHD
- To Fabricate and Install diversion line for VCM CHLORIDE (M) SDN BHD
- To Supply fabricate & install piping on the Nitrogen supply line for ETHYLENE (M) SDN BHD
- Modify of Gangways and Handrails at TTLR for KERTEH TERMINALS SDN BHD
- To perform online sealing for diaphragm valve P-1201A, suction valve size 8″ for VINYL CHROLIDE (MALAYSIA) SDN BHD
- Pipeline Inspection for PII LTD Rental of Workshop and Crane for PGB 42″ / 48″
- Repair Pig 28″ for EPMI for TECHNIC DATA WORKS (M) SDN BHD
- Leak Sealing 2″ at 1501 for VINYL CHROLIDE (MALAYSIA) SDN BHD
- To Perform Hot Bolting ( Torque Wrench) 32″ X 300# ( Hot Bolting E-1507) for VINYL CHROLIDE (MALAYSIA) SDN BHD
- On-Line Sealing for PV1201 ( Damaged 1″ PV -1201) for VINYL CHROLIDE (MALAYSIA) SDN BHD
- Hot Tapping Welding for Natural Gas Distribution at Jln Air-Hitam, Kluang for EMBAH ENGINEERING SDN BHD
- Hot Tap for COD 155-Nitrogen Supply for ETHYLENE (M) SDN BHD
- Leak sealing flange 1″ for VINYL CHROLIDE (MALAYSIA) SDN BHD
- Hot Tap works for Optimal for TECHNIC DATA WORKS (M) SDN BHD
- Annual Pipeline Inspection for KERTEH TERMINALS SDN BHD
- 1 Nos Hot Tapping Boring Work During Shutdown Period for DAYANG ENTERPRISE SDN BHD
- MOD 15/2001 – Bunker & Rundown Pit for POLYETHYLENE MALAYSIA SDN BHD
- Civil & Electrical Work for Oilmop for PETRONAS PENAPISAN (T) SDN BHD
- Hot tapping at Jln Meru and Jln Haji Abdul Manan , Klang, Selangor for MASMIRIN CORP SDN BHD
- TO install 2″ Strainer for cooling water for VINYL CHROLIDE (MALAYSIA) SDN BHD
- To extend various drain lines for PETRONAS AMMONIA SDN BHD
- EPCC for installation of sampling system via Hot Tapping method at scraper station in GPP A & B for TECHNIC DATA WORKS (M) SDN BHD
- To replace the steam trap and check valve to replace the steam trap and check valve for PVC plant for VINYL CHROLIDE (MALAYSIA) SDN BHD
- Pipe Sa 10S GR.B, 16″ Sch 120-160 (2000MTR) for KNM STEEL SDN BHD
- 28″ PIG Repair for TECHNIC DATA WORKS (M) SDN BHD
- To replace the gravel with send for OGP CONSTIUM SDN BHD
- Hot Tapping Boring Works for Pressure Indicator GPP-4 (Sumatec) for OIL – LINE ENGINEERING & ASSOCIATES S/B
- To Fabricate and Install drain pipes for VINYL CHROLIDE (MALAYSIA) SDN BHD.
- Online Leak Sealing at Waste Line 4″ for VINYL CHROLIDE (MALAYSIA) SDN BHD.
- Supply of Studbolt for EXXON MOBILE (M) SDN BHD
- EPCC of Modification for Optimal and Gurun Lateral Pipelines for PETRONAS GAS BERHAD
- Rental of Skift for lifting and installation of Safety railing .for 4days for KERTEH TERMINALS SDN BHD
- To service and maintenance ball valves for PETRONAS GAS BERHAD
- Supply Mild Steel GR 4-6 Hex Machine, Bolt & Buts coated for EXXON MOBILE (M) SDN BHD
- To supply, fabricate and deliver of 3″ flexible hose storage rack for KERTEH TERMINALS SDN BHD
- Marine Hose Shed Maintenance and Repair for PETRONAS PENAPISAN (T) SDN BHD
- To perform welding of 2′ CS – 2 jts, Leak Selaing & Hot Tapping of 2″ x 36″ – 1 point for SHAHPADU ENERGY AND ENGINEERING.
- Putra jaya for LANKHOST.
- Supply 1″ PVC Ball Valve for EXXON MOBILE (M) SDN BHD.
- Leak Sealing 1″ Steam Line for PETLIN (M) SDN BHD.
- Stud bolt A320, L7, CD, PL / Coated cw 2 hvy Nuts
D’TEN SYSTEM SDN BHD To supply Hot Tapping equipment and specialist to perform the 4″ on 16″ Hot Tapping at Section U1 for EXXON MOBILE (M) SDN BHD. - Hot Tapping at Optimal ( OGP – C) for DIALOG PLANT SERVICES SDN BHD
- Kerja – kerja membaikpulih insulation yang rosak dan exhaust duct yg retak di WHB 1A dan 1B for TENAGA NASIONAL BERHAD – GENERATION
- On Line Leak Sealing Services for 2″ Valve 300# for TENAGA NASIONAL BERHAD – GENERATION
- Supply Paint Material for EXXON MOBILE (M) SDN BHD
2001
- Tank Inspection and wall thickness measurement for KERTEH TERMINAL SDN BHD
- Excavation for correlation at Kerteh for PETRONAS GAS BERHAD
- Fabrication Work On 3 Sets Of OXO Hydrofilters for BASF PETRONAS CHEMICALS SDN BHD
- Correlation Work For 10″ dia Condensate Line at Santong Paka (Single Location) for PETRONAS GAS BERHAD
- Fabrication and Testing of Scrapper Launcher and Scrapper Receiver for Telok for Kalong Regulation and Perwaja Meter Station for PERMINT ENGINEERING SDN BHD
- Civil Work for Petronas Carigali Sdn Bhd for DAYANG ENTERPRISE SDN BHD
- The modification works Near A2 Station for PGB for RIRA METAL SDN BHD
- The modification works at Telok Kalong Lateral and regulating station for PGB for RIRA METAL SDN BHD
- Supply deliver and installation of Fire Rated Stainless Steel Door for KTSB for RIMARISAN SDN BHD
- Refurbishment of 8″ Gate Valve 4 Nos for BASF PETRONAS CHEMICALS SDN BHD
- Hot tapping at AMOCO (M) SDN BHD for WARGA HIKMAT KEJURUTERAAN SDN BHD
- Drum Screen Basket for TENAGA NASIONAL GENERATION BERHAD
- MS Casing and Steel Pallet for DREXEL BAKTI OILFIELD SDN BHD
- Emergency Exit Door At Com.House Of GPPB for PETRONAS GAS BERHAD
- Pipe Clamp 12″ for HUNSTMAN TIOXIDE
- Acid Piping for HUNSTMAN TIOXIDE
- Stell Pallet = 20 EA for DREXEL BAKTI OILFIELD SDN BHD
- Supply/Replacement, Installation, and Commissioning Of Lub-Oil for TENAGA NASIONAL GENERATION BERHAD
- Supply and fabrication of working platform for ESSO for PERMINT ENGINEERING SDN BHD
- Hot tapping work for Lumut Gas Metering Station for TECHNIC DATA WORKS (M) SDN BHD
- The Protection Work of MTBE & AMOCO Pipelines for MMCE – FRANKY CONSORTUIM
- Rehabilitation work for NPS 10 feed condensate pipeline for PETRONAS GAS BERHAD
- NPS 16, Telok Klaong Lateral project for TECHNIC DATA WORKS (M) SDN BHD
- EPCC of Corrosion Inhibition Facilities for PETRONAS GAS BERHAD
- Modification at B2 Station for RIRA METAL SDN BHD
- Pump Servicing for PETRONAS WILAYAH PANTAI TIMUR
- 1 1/2 Pipe Monifold for HYDROGAS SDN BHD
- Civil / Structural – oil chemical storage yard for DAYANG ENTERPRISE SDN BHD
- Cold Tapping 2″ at GPP 2 & 3 for PETRONAS GAS BERHAD
- 1.5Km NPS 2″ Propane Pipe for NF ENERGY SDN BHD
- Sphere Tank Inspection for KERTEH TERMINAL SDN BHD
- Hot Tapping for Oily Water Sewer Line Underground for RANHILL ENGINEERING & CONSTRUCTION /SB
- Rehabilation for NPS 36 PGU I and PGU II for PETRONAS GAS BERHAD
- Hot Tap on2″ x1″ x150# 1 ea for BASF PETRONAS CHEMICALS SDN BHD
- Hot Tap for AMOCO CHEMICALS SDN BHD
- Hot Tap for MTBE / TDW
- Cathodic Protection for MMCE – FRANKY CONSORTUIM
- HoT Tap and Stopple For MTBE 8″X8″ X600#-2ea for TECHNIC DATA WORKS
- Hot Tap 6″ and 1″ for WARGA HIKMAT KEJURUTERAAN SDN BHD
- Additional Works for TKRS for PETRONAS GAS BERHAD
- Welding work for Hot Tap 8″ x 8″ x 8″ – 3 points for DIVERSIFIELD ENGINEERING & CONSTRUCTION
- Fabricate Tote Tank Frame for PROTANK SDN BHD
- Welding work for Hot Tap at Teluk Gong, Melaka for RIRA METAL SDN BHD
- Additional Works for TKRS for RIRA METAL SDN BHD
- Additional AMOCO pipeline protection work for AMOCO CHEMICALS SDN BHD
- Welding of 12″ x12″ Paraxylene Line for AMOCO for TECHNIC DATA WORKS
- Reinstate Existing Fencing for MMCE – FRANKY SDN BHD
- EPCC for NPS 20 Ethane Pipeline at Kerteh for PETRONAS GAS BERHAD
- Hot Tapping 3/4″ x 150# -2 pts for TOYO ENGINEERING CORP
- 2″ BY 8″ Pipe spool for KERTEH TERMINAL SDN BHD
- Rental of Pump for TECHNIC GEOPRODUCTION
- Rental of manual cold cut for DIALOG E& C SDN BHD
- Rental of Workshop and equipment for H.ROSEN SDN BHD
- Piping replacement at cooling tower system, Administration building for PETRONAS PENAPISAN ( TERENGGANU) SDN BHD
- Installation of permanent oil Barrier at weir of GPP complex B for PETRONAS GAS BERHAD
- Refurbishment and repair of the Non-return Valve 12″ for HUNSTMAN TIOXIDE SDN BHD
- To carry out cutting and welding job at an Export terminal for PETRONAS GAS BERHAD
- Hot Tap welding for gas relocation at WTDS, Mont Kiara KL. for RASLOW SDN BHD
- Fabrication of 4″ tee leak seal for ML06 leaked for PETRONAS CARIGALI SDN BHD
- To Fabricate Strainer element for STR -1403 for VINYL CHROLIDE (MALAYSIA) SDN BHD
- Hot Tap welding and pipeline relocation work at MERU, Klang for TECHNIC DATA WORKS
- Hot Tap for export line for PETRONAS PENAPISAN ( TERENGGANU) SDN BHD
- Installation of 2nd compressor airline to B100 for BASF PETRONAS CHEMICALS SDN BHD
2000
- SUPPLY 2 FITTER FOR Y2K SHUTDOWN for HUNSTMAN TIOXIDE (M) SDN BHD
- OPTIMAL PROJECT for IBAI BINA SDN BHD
- LIFTING BASKET for HUNSTMAN TIOXIDE (M) SDN BHD
- SUPPLY QC FOR SHUTDOWN for KANEKA SDN BHD
- BOOSTER IMPELLER REPAIR for HUNSTMAN TIOXIDE (M) SDN BHD
- 4″ ACID LINE REPAIR for HUNSTMAN TIOXIDE (M) SDN BHD
- SCREW LIFTER RISER for HUNSTMAN TIOXIDE (M) SDN BHD
- HOT TAPPING CONSULTANCY SERVICE for TECHNIC DATA WORKS / NAM FAT
- PROVISION DOSH WPS / PQR for SYARIKAT T & H GENERAL CONTRACTOR
- SUPPLY INSPECTOR NAHARUDDIN for ATKINS SDN BHD
- FABRICATION OF SPOOL PIECES for TENAGA IDEAL / TECHNIP FAR EAST
- RENTAL OF PRESSURE GAUGE for TECHNIP FAR EAST
- SUPPLY INSPECTOR ROSLAN for ATKINS SDN BHD
- FABRICATE WATER FLOW 2″ PIPE for HUNSTMAN TIOXIDE (M) SDN BHD
- KERTEH – KUANTAN RAILWAY STATION for PERCON BABENA JV
- RETAINER – PLATE / INSTALL & FABRICATE for HUNSTMAN TIOXIDE (M) SDN BHD
- FLANGE ADAPTOR for KERTEH TERMINAL SDN BHD 1 1/2″
- SQUEEZE MANIFOLD for HUNSTMAN TIOXIDE (M) SDN BHD
- REPAIR DOOR for KERTEH TERMINAL SDN BHD
- SUPPLY WELDERS for HUNSTMAN TIOXIDE (M) SDN BHD
- 4 ” ELBOW POLYMER CERAMIC for HUNSTMAN TIOXIDE (M) SDN BHD
- REPAIR 10″ PIPE for PETRONAS GAS BERHAD
- WPS , PQR , WQT for PROJASS ENERCORP S/B
- SH 1, 2,4 SKA OCB for HUNSTMAN TIOXIDE (M) SDN BHD
- REFURBISHMENT OF PIG for TDW / EMPI
- RENTAL OF WORKSHOP for TLO
- RENTAL OF WORKSHOP for ALAIKA JAYA
- WPS / PQR TEST for HEXIUMTECH SDN BHD
- FABRICATION FOR MOUNTING STAND for HUNSTMAN TIXODE (M) SDN BHD
- INSTALL 24″ LAGOON WATER for HUNSTMAN TIXODE (M) SDN BHD
- WQT FOR ETHANE for PROJASS ENERCORP BERHAD
- SUPPLY OF BOILERPLATE for HAVEN ENGINEERING SDN BHD
- 2″ LAUSTIC SODA PIPE for HUNSTMAN TIXODE (M) SDN BHD
- HOT TAP FOR 3″ PIPE for TDW / AMOCO
- SQUEEZE MANIFOLD for HUNSTMAN TIXODE (M) SDN BHD
- SUPPLY OF AIRBAG for AMOCO CHEMICALS SDN BHD
- KNOCKER ROTARY for HUNSTMAN TIXODE (M) SDN BHD
- INSPECTION TANK for KERTEH TERMINALS SDN BHD
- PIPE SPOOL FABRICATION EPMI for PERMINT ENGINEERING SDN BHD
- CIVIL WORK for PROJASS ENERCORP BERHAD
- CORPERAS CONVEYOR PLATFORM for HUNSTMAN TIOXIDE (M) SDN BHD
- CIVIL WORK for TL OFFSHORE SDN BHD
- INTERNAL CLEANING PIPE for PETRONAS GAS BERHAD – TOD
- SUPPLY MANPOWER & CRANE for KERTEH TERMINALS SDN BHD
- CIVIL WORK for WINTURA SDN BHD
- SUPPLY MANPOWER for PTIS – BAXTECH J.V.
- PIPE SPOOL 4″ & 3″ for HUNSTMAN TIOXIDE (M) SDN BHD
- WELDING WORK AT MELAKA for RIRA METAL SDN BHD
- KNOCKER #2 for HUNSTMAN TIOXIDE (M) SDN BHD
- SUPPLY AIRBAG STOPPERS for DAYANG ENTERPRISE SDN BHD
- SUPPLY AIRBAG STOPPERS for AMOCO CHEMICALS (M) SDN BHD
- SUPPLY MANPOWER for PTIS – BAXTECH J.V.
- POST WELD HEAT TREATMENT for HAVEN ENGINEERING SDN BHD
- RENTAL EQUIPMENT for PTIS – BAXTECH J.V.
- RENTAL PRESSURE RECORDER for W & R MAJU TRADING
- LADDER PLATFORM for ETHYLENE (M) SDN BHD
- PIP AXIAL for HUNSTMAN TIOXIDE (M) SDN BHD
- ISOMETRIC & CALCULATION for KERTEH TERMINALS SDN BHD
- INTERNAL PIPE CLEANING for PI GAS ENGINEERING SDN BHD
- KNOCKER PING for HUNSTMAN TIOXIDE (M) SDN BHD
- SUPPLY MANPOWER & CABLE SOCKET for KERTEH TERMINALS SDN BHD
- SUPPLY INSPECTOR for KERTEH TERMINALS SDN BHD
- MSU BOTTOM SUPPORT for HUNSTMAN TIOXIDE (M) SDN BHD
- SUPPLY MANPOWER for PTIS – BAXTECH JV SDN BHD
- RENTAL EQUIPMENT for PTIS – BAXTECH JV SDN BHD
- PTIS – BAXTECH JV SDN BHD
- REPAIR PIG 30″ for TDW / EPMI
- DEVELOP WPS/PQR/WQT for PETRONAS GAS BERHAD
- HOT TAP AT AROMATIC for TDW / PPTSB
- FUEL BULK – PRAI for PETRONAS DAGANGAN BERHAD
- SUPPLY MANPOWER for PTIS – BAXTECH JV SDN BHD
- Construction and Installation of 1.5KM 20″ Piping from TCOT to KR-1 for ALGOTECH (M) SDN BHD / EXXON MOBILE EXPLORATION
- Construction & Installation of 3km of 10″,16″ and 8″ Underground Piping at PVC plant Kerteh for ALGOTECH (M) SDN BHD / VCM
1999
- SUPPLY OF BACKHOLE /PLUMBING WORK for WINTURA SDN BHD
- HOT TAPPING AT ETHYLENE for EMSB (M) SDN BHD
- 20″ PIPING INSTALLATION TCOT TO KR -1 for ALGOTECH (M) SDN BHD
- SUPPLY MANPOWER for LAGENDA ENGINEERING SDN BHD
- HOT TAPPING AT TITAN PROJECT , PASIR GUDANG for RED ARMOR SDN BHD
- HOT TAPPING FOR PSR II AT PP(M)S/B for MS TECHNICAL SDN BHD
- FABRICATION FOR ACID LINE for TIOXIDE (M) SDN BHD
- UNDERGROUND PIPING AT PVC KERTEH for ALGOTECH (M) SDN BHD
- HOT TAP for TDW / SAGA DIALOG
- FABRICATION OF SS BOOSTER FAN for HUNSTMAN TIOXIDE (M) SDN BHD
- SUPPLY INSPECTOR for FAME MERIDIAN SDN BHD
- FIRERING PIPE ALIGMENT for TIOXIDE (M) SDN BHD
- REACTOR BEP PLATE REPAIR for TIOXIDE (M) SDN BHD
- SUPPLY MANPOWER FOR FIREHEATER PROJECT, ALASKA for BORN ASIA SDN BHD
- SUPPLY MANPOWER for EMBAH ENGINEERING SDN BHD
- SUPPLY MANPOWER TO OFFSHORE CARIGALI for PIPETRONIX SDN BHD
- SUPPLY MANPOWER for TIOXIDE (M) SDN BHD
- CARBIDE LINE MIXING LINE INSTALLATION for HUNSTMAN TIOXIDE (M) SDN BHD
- FABRICATION & INSTALL BOILER ( HP HEADER ) for HUNSTMAN TIOXIDE (M) SDN BHD
- 3″ NUTURE GAS PIPELINE for HUNSTMAN TIOXIDE (M) SDN BHD
SUPPLY MANPOWER for TIOXIDE (M) SDN BHD - HEAT SHRINK SLEEVE TECHANICAL for PERMINT ENGINEERING SDN BHD
- LOAD TEST for HUNSTMAN TIOXIDE (M) SDN BHD
- D-35 BARAM PROJECT for PIPETRONIX SDN BHD
- HOT TAPPING FOR GAS MALAYSIA PIPELINE for TDW / MMCE
- HOT TAPPING AT GPP 11/2″ for PERMINT ENGINEERING SDN BHD
- SUPPLY MANPOWER AT PASIR GUDANG for ATKINS INSPECTION SDN BHD
- INTERNAL CLEANING 28″ OD PIPELINE for PERMINT ENGINEERING SDN BHD
- SUPPLY (2 ) MANPOWER – WELDER for HUNSTMAN TIOXIDE (M) SDN BHD
- REPLACEMENT OF REBLENDING PLATFORM for HUNSTMAN TIOXIDE (M) SDN BHD
- WPQ / WQT / PQR for HUNSTMAN TIOXIDE (M) SDN BHD
- ACID LINE AT HTMAS for EXCELL SDN BHD
- SUPPLY MANPOWER for HUNSTMAN TIOXIDE (M) SDN BHD
- ADDITIONAL WORK ( T 37/99) for HUNSTMAN TIOXIDE (M) SDN BHD
- SUPPLY OF SURVEYOR AND 2 CHAIN MAN for PERMINT ENGINEERING SDN BHD
- RETAINER PLATE INSTALLATION for HUNSTMAN TIOXIDE (M) SDN BHD
- REACTOR BED PLATE for HUNSTMAN TIOXIDE (M) SDN BHD
- SUPPLY OF FILLER ROD HASTELLOY for HUNSTMAN TIOXIDE (M) SDN BHD
- SUPPLY MAN POWER FOR TLO PROJECT for PIPETRONIX SDN BHD
- PAINTING OF PIPE RISER for PERMINT ENGINEERING SDN BHD
- PAINTING OF FLANGE , 28″ for PERMINT ENGINEERING SDN BHD
- Construction and Installation of 1.5KM 20″ Piping from TCOT to KR-1 for ALGOTECH (M) SDN BHD / EXXON MOBILE EXPLORATION
- Construction & Installation of 3km of 10″,16″ and 8″ Underground Piping at PVC plant Kerteh for ALGOTECH (M) SDN BHD / VCM